    1111The following figure shows a synthetic view of the ADAM project. The project is composed of 3 Work-Packages (WP). The first one, WP1 is dedicated to online non-intrusive monitoring, the second one, WP2, addresses the problem of online diagnosis and event database management and  WP3 deals with constraint-driven application remapping.
    1212[[BR]]
    13 WP1 contains 3 tasks: the first one 1a) is dedicated to performance measurement, the second one 1b) will give figures for power consumption, temperature and voltage and the third one 1c) addresses fault detection techniques. Information provided by these 3 tasks are then gathered in the Distributed Raw Event Tables (DRET) which are tables of “first-level” measurements distributed among the different processing tiles of the architecture. The objective of this WP is to obtain a whole set of information which allows to perform a correct diagnosis of the architecture.
    1413[[BR]]
    15 WP2 takes as input the DRET from WP1, and its objective is to obtain a Consolidated Database of multi-parameters Architecture Instant Map (AIM), called AIM-DB. This database will have a formalism that will enable the different application remapping scenarios developed in WP3. To perform the WP2 objective, 4 tasks are defined: 2a) which allows access to the database and history management when needed, 2b) periodically analyses the DRET to gives inputs to the AIM, 2c) trigs alerts when important events from the DRET are detected and 2d) performs some intrusive diagnosis/test tasks after alerts have been triggered.
     14'''WP1''' contains 3 tasks: the first one 1a) is dedicated to performance measurement, the second one 1b) will give figures for power consumption, temperature and voltage and the third one 1c) addresses fault detection techniques. Information provided by these 3 tasks are then gathered in the Distributed Raw Event Tables (DRET) which are tables of “first-level” measurements distributed among the different processing tiles of the architecture. The objective of this WP is to obtain a whole set of information which allows to perform a correct diagnosis of the architecture.
    1615[[BR]]
    17 AIM-DB is the direct input of the WP3. The objective of this WP is to dynamically adapt the application with this knowledge of the architecture present state with respect to monitored events. The outputs are the different methods that will be developed to perform this self-adaptability, and the associated software codes and hardware developments. Task 3a) will study a centralized remapping scenario where the information found in  AIM-DB is exploited globally to perform application remapping and binary relinking/reloading, while task 3b) will examine the distributed remapping scenario which takes advantage on AIM-DB to perform local or global remapping orders. Finally, task 3c) defines a common set of example applications that will be used for the validation of the different concepts.
     16[[BR]]
     17'''WP2''' takes as input the DRET from WP1, and its objective is to obtain a Consolidated Database of multi-parameters Architecture Instant Map (AIM), called AIM-DB. This database will have a formalism that will enable the different application remapping scenarios developed in WP3. To perform the WP2 objective, 4 tasks are defined: 2a) which allows access to the database and history management when needed, 2b) periodically analyses the DRET to gives inputs to the AIM, 2c) trigs alerts when important events from the DRET are detected and 2d) performs some intrusive diagnosis/test tasks after alerts have been triggered.
     18[[BR]]
     19[[BR]]
     20AIM-DB is the direct input of the '''WP3'''. The objective of this WP is to dynamically adapt the application with this knowledge of the architecture present state with respect to monitored events. The outputs are the different methods that will be developed to perform this self-adaptability, and the associated software codes and hardware developments. Task 3a) will study a centralized remapping scenario where the information found in  AIM-DB is exploited globally to perform application remapping and binary relinking/reloading, while task 3b) will examine the distributed remapping scenario which takes advantage on AIM-DB to perform local or global remapping orders. Finally, task 3c) defines a common set of example applications that will be used for the validation of the different concepts.