Index: /anr/section-ressources.tex
===================================================================
--- /anr/section-ressources.tex	(revision 349)
+++ /anr/section-ressources.tex	(revision 350)
@@ -74,18 +74,18 @@
   No specific equipment acquisition. The costs for depreciation of
   workstations is evaluated to 4\% of the total requested ANR funding.
-\item [Personnel costs]
-  The faculty members involved in the project are Christophe Alias
-  (INRIA researcher) and Paul Feautrier (emeritus professor at
-  ENS-Lyon). The non-permanent personel required is a post-doc that
-  will work on FIFO construction, then on extensions of process
-  construction and memory optimization to non-polyhedral loops.  We
-  are looking for a candidate with both theoretical and practical
-  skills, that will be able to get a sufficient understanding of the
-  polyhedral techniques to produce a working implementation.  \parlf
-  The table below summarizes the \hommemois by deliverables and tasks
-  for both permanent and non-permanent personnels.  The non-permanent
-  personnels costs represents \mustbecompleted{??}\% of the personnal costs. The
-  requested funding for non permanent personnels is 100\% of the
-  total ANR requested
+\item [Personnel costs] The faculty members involved in the project
+  are Christophe Alias (INRIA researcher) and Paul Feautrier (emeritus
+  professor at ENS-Lyon). The non-permanent personel required is a
+  post-doc that will work on FIFO construction, then on extensions of
+  process construction and memory optimization to non-polyhedral
+  loops.  We are looking for a candidate with both theoretical and
+  practical skills, that will be able to get a sufficient
+  understanding of the polyhedral techniques to produce a working
+  implementation.  \parlf The table below summarizes the \hommemois by
+  deliverables and tasks for both permanent and non-permanent
+  personnels.  The effort of permanent personnels represents 61\% of
+  the total effort. The non-permanent personnels costs represents
+  52\% of the personnal costs. The requested funding for non permanent
+  personnels is 100\% of the total ANR requested
   funding.  \begin{center}\input{table_inria_compsys_full.tex}\end{center}
 \item [Subcontracting]
