Index: /anr/annexe-autre-participation.tex
===================================================================
--- /anr/annexe-autre-participation.tex	(revision 360)
+++ /anr/annexe-autre-participation.tex	(revision 361)
@@ -25,5 +25,5 @@
 \autreprojettabularentry
     {2}{Greiner}{4}
-    {Tsar, CATRENE, 695 k\euro}
+    {Tsar, CATRENE, 400 k\euro}
     {Tera Scale ARchitecture}
     {\makebox{Huy-Nam} Nguyen (Bull)}
Index: /anr/annexe-cv.tex
===================================================================
--- /anr/annexe-cv.tex	(revision 360)
+++ /anr/annexe-cv.tex	(revision 361)
@@ -56,5 +56,5 @@
   {{Nguyen}{Huy-Nam}{56}}
   {Head of MVS Departement at Bull S.A.S}
-  {Thesis (1977), ENSMP Engineer (1977)}
+  {Thesis (1982), ENSMP Engineer (1977)}
   {{5}{}}
   \item[Projects]\mbox{}
@@ -92,8 +92,4 @@
   \item[Course of Lectures]\mbox{}
        Compilers, programming languages, computer architecture, networks.
-  \item[Projects]\mbox{}
-    \begin{itemize}
-    \item Nano2012 S2S4HLS, 2009--
-    \end{itemize}
 \end{cvenv}
 %
@@ -204,5 +200,5 @@
 %
 \begin{cvenv}
-  {{Lemonier}{Fabrice}{43}}
+  {{Lemonnier}{Fabrice}{43}}
   {Research program manager}
   {PhD (1996), Master in parallel computing (1992), EFREI Engineer (1991)}
Index: /anr/anr.sty
===================================================================
--- /anr/anr.sty	(revision 360)
+++ /anr/anr.sty	(revision 361)
@@ -29,4 +29,24 @@
 \immediate\write\@auxout{\expandafter\string\expandafter\gdef\expandafter\string\csname NOVL#1\endcsname{\@novers{\name}}}%
 #2}
+
+%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
+%\AtBeginDocument{
+%  \renewcommand{\@listi}{
+%    \setlength{\leftmargin}{\leftmargini}
+%    \setlength{\topsep} {2pt}
+%    \setlength{\parsep} {\parskip}
+%    \setlength{\itemsep}{3pt}}
+% \renewcommand{\@listii}{
+%   \setlength{\leftmargin}{\leftmarginii}
+%   \setlength{\topsep} {1pt}
+%   \setlength{\parsep} {0pt}
+%   \setlength{\itemsep}{1pt}}
+% \renewcommand{\@listiii}{
+%   \setlength{\leftmargin}{\leftmarginiii}
+%   \setlength{\topsep} {1pt}
+%   \setlength{\parsep} {0pt}
+%   \setlength{\itemsep}{1pt}}
+%}
+
 
 %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
Index: /anr/section-2.tex
===================================================================
--- /anr/section-2.tex	(revision 360)
+++ /anr/section-2.tex	(revision 361)
@@ -21,5 +21,5 @@
 %based on C/C++ and SystemC are the most popular, but few of them are specifically targetting FPGAs.
 %%%
-\parlf
+%
 The COACH project will propose a new design flow based on a small number of architectural templates.
 An architectural template is a generic, parameterized architecture, relying on a predefined library 
@@ -63,5 +63,5 @@
 %%those various technologies, and to define the detailed architecture of the proposed design flow.
 %%%%
-\parlf
+%
 In HPC (High Performance Computing), the targeted application is an existing one
 running on a PC.
Index: /anr/section-consortium-desc.tex
===================================================================
--- /anr/section-consortium-desc.tex	(revision 360)
+++ /anr/section-consortium-desc.tex	(revision 361)
@@ -223,5 +223,5 @@
 them in the transformation of their information systems and to optimize their IT
 infrastructure and their applications.
-\parlf
+\\%\parlf
 \bull is particularly present in the public sector, banking, finance, telecommunication
 and industry sectors. Capitalizing on its wide experience, the Group has a thorough
@@ -262,5 +262,5 @@
 %technologies including man system interaction.
 The Embedded System Laboratory (ESL) involved in the COACH project is part of
-TRT, it is based in Centres (France).
+TRT, it is based in Palaiseau (France).
 \parlf
 Like other labs of TRT, ESL is in charge of making the link between the needs
Index: /anr/section-consortium-people.tex
===================================================================
--- /anr/section-consortium-people.tex	(revision 360)
+++ /anr/section-consortium-people.tex	(revision 361)
@@ -81,11 +81,11 @@
 %\end{peopletabular}\begin{peopletabular}
 \peopletabularentry{\ubs}
-\RE & Coussy      & Philippe    & \mbox{\AP}           & SOC HLS \ARCH \VP        & 12 & Task: 1, 2, \TL{5}, \mustbecompleted{X, Y}, 8 \\\hline 
-\ME & Heller      & Dominique   & \mbox{\RENG}         & \COMP HLS \ARCH          &  8 & Task: \mustbecompleted{X, Y} \\\hline
-\ME & Chavet      & Cyrille     & \mbox{\AP}           & SOC HLS \ARCH            &  4 & Task: \mustbecompleted{X, Y} \\\hline
+\RE & Coussy      & Philippe    & \mbox{\AP}           & SOC HLS \ARCH \VP        & 12 & Task: 1, 2, \TL{5}, 8 \\\hline 
+\ME & Heller      & Dominique   & \mbox{\RENG}         & \COMP HLS \ARCH          &  8 & Task: 2, 5, 8 \\\hline
+\ME & Chavet      & Cyrille     & \mbox{\AP}           & SOC HLS \ARCH            &  4 & Task: 2, 5, 8 \\\hline
 %\end{peopletabular}\begin{peopletabular}
 \peopletabularentry{\liplong}
-\RE & Alias       & Christophe  & \mbox{\INRE}        & \COMP HPC \MM    & 15 & Task: 1, 2, \TL{4}, 8 \mustbecompleted{X, Y} \\\hline
-\ME & Feautrier   & Paul        & \mbox{\EP}          & \COMP \AUPA      & 13 & Task: \mustbecompleted{X, Y} \\\hline
+\RE & Alias       & Christophe  & \mbox{\INRE}        & \COMP HPC \MM    & 13 & Task: 1, 2, \TL{4}, 8  \\\hline
+\ME & Feautrier   & Paul        & \mbox{\EP}          & \COMP \AUPA      & 12 & Task: 2, 4, 7, 8 \\\hline
 %\end{peopletabular}\begin{peopletabular}
 \peopletabularentry{\tima}
@@ -95,6 +95,6 @@
 %\end{peopletabular}\begin{peopletabular}
 \peopletabularentry{\inria}
-\RE & Charot      & FranÃ§ois     & \mbox{\INRE}       & SOC ASIP \ARCH     & 12 & Task: 1, 2, 4, 8 \\\hline
-\ME & Derrien      & Steven      & \mbox{\AP}         & HLS \COMP\ARCH &   6 & Task: 2, 4, 8\\\hline
+\RE & Charot      & FranÃ§ois     & \mbox{\INRE}       & SOC ASIP \ARCH     & \mustbecompleted{12} & Task: 1, 2, 4, 8 \\\hline
+\ME & Derrien      & Steven      & \mbox{\AP}         & HLS \COMP\ARCH     & \mustbecompleted{6} & Task: 2, 4, 8\\\hline
 %\end{peopletabular}\begin{peopletabular}
 \peopletabularentry{\bull}           
@@ -102,7 +102,7 @@
 %\end{peopletabular}\begin{peopletabular}
 \peopletabularentry{\thales}                       
-\RE & Lemonier    & Fabrice     & \DM                 & SOC                & 18 & Task: \mustbecompleted{X, Y} \TL{7} \\\hline
+\RE & Lemonnier   & Fabrice     & \DM                 & SOC ARCH           &  7 & Task: 1, \TL{7}, 8 \\\hline
 \ME & Brelet      & Paul        & \mbox{SW\,development}
-                                                      & \SW                & 18 & Task: 7,8  \\\hline
+                                                      & \SW                &  8 & Task: 7,8  \\\hline
 \end{peopletabular}
 \caption{\label{involved:people} People that participate to the project.}
Index: /anr/section-dissemination.tex
===================================================================
--- /anr/section-dissemination.tex	(revision 360)
+++ /anr/section-dissemination.tex	(revision 361)
@@ -118,8 +118,11 @@
 
 \subsubsection*{Partner: \textit{\bull}}
-The team of \bull participating to the COACH project is from the Server Development
-Department who is in charge of developing hardware for open servers (e.g. NovaScale) and
-HPC solutions. The main expectation from COACH is to derive a new component (fine-grain
-FPGA parallelism) to add to existing Bull HPC solutions.
+\noindent
+The Bull team participating to COACH is from the Server Design and Development Division,
+who is in charge of developing hardware for open servers (e.g.: NovaSacle, Bullion) and
+HPC solutions. With this participation, Bull demonstrates its high interest in the outcome of
+COACH. Effectively, it is now commonly recognized that the future of HPC will be based
+on hybrid architectures in which FPGA will play a major role in the development of configurable
+hardware accelerators by providing the best fine grain parallelism.
 
 \subsubsection*{Partner: \textit{\thales}}
@@ -137,5 +140,5 @@
   synthesis of system embedding control and data flow aspects.
 \end{itemize}
-\parlf
+%
 TRT (Thales Research and Technology) has the mission to assess and de-risk the emerging
 technologies in its domains of expertise. Specifically in COACH, the studied technology is
@@ -158,5 +161,4 @@
 \subsubsection*{Industrial supports}
 
-\mustbecompleted{NON A JOUR}
 The following SMEs demonstrate interest to the COACH project (see the "letters of
 interest" in annexe~\ref{lettre-soutien}) and will follow the COACH evolution and will
@@ -164,6 +166,7 @@
 \letterOfInterest{ALTERA Corporation}{lettres-2011/Altera1.pdf},
 \letterOfInterestPlus{lettres-2011/Altera2.pdf}
+\letterOfInterest{FlexRAS Technologies}{lettres-2011/Flexras.pdf},
+\letterOfInterest{INPIXAL}{lettres-2011/Inpixal.jpg},
 %\letterOfInterest{ADACSYS}{lettres-2011/Coach_ADACSYS_lettre_interet},
-%\letterOfInterest{INPIXAL}{lettres-2011/inpixal.jpg},
 %\letterOfInterest{CAMKA System}{lettres-2011/CAMKA-System.pdf},
 %\letterOfInterest{ATEME}{lettres-2011/ATEME.pdf},
Index: /anr/section-ressources.tex
===================================================================
--- /anr/section-ressources.tex	(revision 360)
+++ /anr/section-ressources.tex	(revision 361)
@@ -127,12 +127,10 @@
 \ressourcesForAcademic
   {upmc}
-  { In order to validate the COACH design flow, \upmc will buy FPGA development
-    boards (especially 1  PCI/E FPGA \xilinx board).
-    The cost for these boards is estimated to 4500 \euro (3\% of the total ANR funding).}
-  {{\upmc}{52}{24}{Alain Greiner and Ivan Aug\'e}{87}{
+  {}
+  {{\upmc}{52}{24}{Alain Greiner and Ivan Aug\'e}{88}{
      We are looking for a profile with strong skills in SW development and good
      knowledge in SoC design and virtual prototyping.
    }}
-  {7}{3.5}
+  {8}{3.5}
 % 
 % \begin{description}
@@ -169,9 +167,5 @@
 \ressourcesForAcademic
   {ubs}
-  { In order to validate the design flow project, the Lab-STICC laboratory will buy FPGA
-    development boards.  The cost for these FPGA boards is estimated to 3\% of the total
-    ANR funding.
-    \mustbecompleted{INCOHERENCE avec SITE ANR}
-  }
+  {}
   {{\ubs}{48}{24}{Philippe COUSSY, Cyrille CHAVET and Dominique HELLER}{83}{
    \mustbecompleted{\\UBS: A) manque 1 profil ici, B) dans annexe 7.2 il ne faut que 5
@@ -215,11 +209,8 @@
 \ressourcesForAcademic
  {inria_compsys}{}
- {{\lip}{46}{22}{Christophe Alias and Paul Feautrier}{100}{
+ {{\lip}{46}{21}{Christophe Alias and Paul Feautrier}{\mustbecompleted{100}}{
    \\We are looking for a candidate with both theoretical and
    practical skills, that will be able to get a sufficient
    understanding of the polyhedral techniques.
-   \mustbecompleted{\\LIP: DANS FIG.8 vous avez 28 hm. 46-28=18 --> 40\%\\
-   IL FAUT ETRE <= 50\%, le max de non permanent est 23.}
-   \mustbecompleted{\\LIP: Vous n'etes dans aucuns projets annexe 7.3 ?}
    \mustbecompleted{\\LIP: ./gantt < anr.gant\\
    \t WARNING: lip       :D432 probleme sur l'an 2 (in table=7.0, in gantt=6.0 \\
@@ -227,5 +218,5 @@
    \t ERROR:   lip       :D730 probleme sur l'an 3 (in table=0.0, in gantt=3.0}
    }}
- {\mustbecompleted{(LIP: ca fait beaucoup) }20}{4}
+ {12}{4}
 %
 % \begin{description}
@@ -315,8 +306,5 @@
     We are looking for a profile with strong skills in SW development and good
     knowledge in computer architecture.
-%   \mustbecompleted{\\IRISA figure 8 vous avez 18 hm vous devez avoir 22.}
-%   \mustbecompleted{\\IRISA: Vous n'etes dans aucuns projets annexe 7.3 ?}%
-%   \mustbecompleted{\\IRISA: ./gantt < anr.gant\\
-%     \t ERROR:   inria     :D420 probleme sur l'an 3 (in table=0.0, in gantt=3.0}
+   \mustbecompleted{\\IRISA figure 8 vous avez 18 hm vous devez avoir au moins 23.}
     }}
  {10}{4}
@@ -355,8 +343,8 @@
 \ressources
   {bull}
-  { Acquisition of a FPGA development board will represent the main equipment cost for
-    Bull in COACH. It is estimated at about 5\% (tbc) of the total funding.
-    \mustbecompleted{INCOHERENCE avec SITE ANR}
-    }
+  { The design of FPGA board (s) will represent the main equipment cost for Bull
+    in COACH. It is estimated at about 10 k\euro (about 12\% of the total
+    requested ANR funding) representing the re-design/adaptation of an
+    existing FPGA board (the SAM "Simulation Accelerated Module" board).}
   {
     The man power detail in \hommemois by deliverables is given in
@@ -392,12 +380,10 @@
   {thales}
   { In order to validate the design flow,TRT will buy FPGA developpement boards. The cost
-    for these FPGA boards is estimated to 11 k\euro (6\% of the total ANR funding).
-    \mustbecompleted{INCOHERENCE avec SITE ANR}
-    }
+    for these FPGA boards is estimated to 11 k\euro (6\% of the total ANR funding).}
   { The man power detail in \hommemois by deliverables is given in
-    annexe~\ref{table-livrables-thales} (page \pageref{table-livrables-thales}).
+    annexe~\ref{table-livrables-thales} (page \pageref{table-livrables-thales})
     and a summary by task in the following table.
-    \thales employees involved in the project are a manager for 18 \hommemois
-    and an engineer  for 18 \hommemois.}
+    \thales employees involved in the project are a manager for 7 \hommemois
+    and an engineer  for 8 \hommemois and a PHD candidate for 21 \hommemois}
   {5}{}
 
Index: /anr/task-frontend.tex
===================================================================
--- /anr/task-frontend.tex	(revision 360)
+++ /anr/task-frontend.tex	(revision 361)
@@ -45,5 +45,5 @@
       \itemV{0}{12}{x}{\Sinria}{SystemC for extensible MIPS }
       { A SystemC simulation model for a simple extensible MIPS architectural template }
-      \itemL{12}{27}{x}{\Sinria}{SystemC for extensible MIPS}{3:3:0}
+      \itemL{12}{27}{x}{\Sinria}{SystemC for extensible MIPS}{3:2:1}
       {A SystemC simulation model for an extensible MIPS with a tight architectural integration of
       its instruction set extensions}
