Changeset 39 for anr


Ignore:
Timestamp:
Jan 19, 2010, 4:19:30 PM (14 years ago)
Author:
coach
Message:

Paul: taches 0, 1, 2.

Location:
anr
Files:
3 edited

Legend:

Unmodified
Added
Removed
  • anr/task-0.tex

    r36 r39  
    1414project.
    1515\item To organize the project meetings (every 3 months).
    16 \item To set up a shared development and dissemination infrastructure as a version control
    17     system version and web site.
    18 \item To ensure the dissemination by providing the COACH releases (milestones and final
    19     release) and their associated installation howto.
     16\item To set up a shared development and dissemination infrastructure as a
     17version control system and web site.
     18\item To ensure the dissemination by providing the COACH releases
     19(milestones and final release) and their associated installation manuals.
    2020\end{itemize}
    2121\end{objectif}
    2222%
    2323\begin{workpackage}{D0}
    24 \item This \ST consists of the writing of the consortium agreement and of having the
    25     patners to sign it.
     24\item This \ST consists of the writing of the consortium agreement and of
     25having the partners sign it.
    2626    \begin{livrable}
    27     \item{}{0}{6}{d}{\Supmc}{Consortium agreement} A document discribing the
    28         consortium agreement and signed by all the partners.
     27    \item{}{0}{6}{d}{\Supmc}{Consortium agreement} A document describing the
     28        consortium agreement, signed by all the partners.
    2929    \end{livrable}
    3030\item This \ST consists of the managment of deliverables and of the organisation of
     
    3535    \item{}{24}{36}{d}{\Supmc}{Final report}
    3636    \end{livrable}
    37 \item This \ST consists firstly of the set up of the development and dissemination
    38     infrastructure. Then it consists in providing the COACH distribution releases and
    39     in maintaining the dissemination infrastructure.
     37\item This \ST consists firstly in the building and maintenance of the
     38development and dissemination infrastructure. It is also in charge of
     39consists in distributing the COACH releases.
    4040    \begin{livrable}
    41     \item{}{0}{6}{}{\Supmc}{infrastructure setup} This task consists of the setup of the
    42         dissemination infrastructure (web site, wiki, faq) and of the setup of the
     41    \item{}{0}{6}{}{\Supmc}{infrastructure setup} Building the
     42        dissemination infrastructure (web site, wiki, faq) and the
    4343        development infrastructure (version control system configuration).
    44     \item{}{6}{36}{}{\Supmc}{dissemination} This task consists providing the COACH
    45     distribution releases and in maintaining the dissemination infrastructure.
     44    \item{}{6}{36}{}{\Supmc}{dissemination} Providing the COACH
     45    distribution releases and maintaining the dissemination infrastructure.
    4646    \end{livrable}
    4747\end{workpackage}
  • anr/task-1.tex

    r38 r39  
    55%
    66\begin{objectif}
    7 This task deals with to the main features for embedded system.
    8 Its objective consists of the specification of the designer input, of the
    9 definition of the hardware architectural templates and of all the features
     7This task deals with the main features for embedded systems.
     8Its objectives are the specification of the designer input, the
     9definition of the hardware architectural templates and all the features
    1010that the HAS tools share.
    1111\end{objectif}
     
    2727        descriptions.
    2828    \item{VF}{6}{12}{d}{\Supmc}{COACH user manual} \setMacroInAuxFile{specGenManual}
    29         The COACH user manual of the \specGenManualI delivrable updated with the feed-backs
     29        The COACH user manual of the {\specGenManualI} delivrable updated with the feed-backs
    3030        of the demonstrator \STs.
    3131    \item{V1}{0}{6}{d}{\Stima}{CSG user manual} \setMacroInAuxFile{specCsgManualI}
     
    3939        synthesis.
    4040    \item{VF}{6}{12}{d}{\Stima}{CSG user manual} \setMacroInAuxFile{specCsgManual}
    41         The CSG user manual of the \specGenManualI delivrable updated with the feed-backs
     41        The CSG user manual of the {\specGenManualI} delivrable updated with the feed-backs
    4242        of the demonstrator \STs.
    4343    \item{V1}{0}{6}{d}{\Subs}{HAS user manual} \setMacroInAuxFile{specHasManualI}
     
    4848        coprocessor synthesis.
    4949    \item{VF}{6}{12}{d}{\Subs}{HAS user manual} \setMacroInAuxFile{specHasManual}
    50         The HAS user manual of the \specGenManualI delivrable updated with the feed-backs of
     50        The HAS user manual of the {\specGenManualI} delivrable updated with the feed-backs of
    5151        the demonstrator \STs.
    5252    \end{livrable}
     
    7676        This delivrable is composed of 2 softwares.
    7777        The first software is a GCC plugin that generates a \xcoach description
    78         (defined in \specXcoachDocI deliverable) from a C++ task description
     78        (defined in {\specXcoachDocI} deliverable) from a C++ task description
    7979        (defined in \specHasManual deliverable).
    8080        The second software regenerates a C description from a \xcoach
     
    109109        The document define the macro cell and the file format describing them.
    110110    \item{}{6}{12}{x}{\Subs}{macro-cell library generator}
    111         A progam that generates automatically the characterized macro-cell library
     111        A program that generates automatically the characterized macro-cell library
    112112        for a FPGA device.
    113113    \end{livrable}
  • anr/task-2.tex

    r38 r39  
    66%
    77\begin{objectif}
    8 This task relies to the prototyping and the generation of FPGA-SoC digital systems.
     8This task deals with the prototyping and the generation of FPGA-SoC digital systems.
    99Its is described on figure~\ref{archi-csg}.
    1010Its objective is to allow the system designer to explore the system space design by
     
    4040    \item{VF}{24}{36}{x}{\Supmc}{CSG} Maintenance work of CSG.
    4141    \end{livrable}
    42 \item This \ST relies to the components of the architectural template.
     42\item This \ST deals with the components of the architectural template.
    4343    \\
    4444    For the COACH architectural template, it consists of the devlopment of the VHDL
     
    4848    \\
    4949    For the XILINX and ALTERA architectural template, we use the XILINX and ALTERA IPs.
    50     The component that miss is the MWMR used for commucation between the task of the
     50    The missing component is the MWMR used for communication between the tasks of the
    5151    application.
    5252    \begin{livrable}
     
    6363    \item{V1}{6}{18}{x}{\Sirisa}{ALTERA architecture}
    6464        \setMacroInAuxFile{csgAlteraSystemC}
    65         The SystemC simulation module of the MWMR component with a AVALON bus interface plus
     65        The SystemC simulation module of the MWMR component with an AVALON bus interface plus
    6666        the SystemC modules of the components of the ALTERA architectural template
    6767        not available in the SocLib component library.
Note: See TracChangeset for help on using the changeset viewer.