source: anr/section-7.tex @ 119

Last change on this file since 119 was 119, checked in by coach, 15 years ago

Paul: Minor language modifications.

File size: 9.1 KB
RevLine 
[53]1\def\resstablestyletitle#1{\begin{tiny}\textbf{\textit{#1}}\end{tiny}}
2
3%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
4\subsection{Partner 1: \irisa}
5\ressourcehelp
6
7%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
8\subsection{Partner 2: \lip}
[87]9%\ressourcehelp
10\begin{figure}\leavevmode\center
11\input{table_lip_full.tex}
12\caption{\label{ress-detail-lip}Man power in $mm$ for the delivrables of \lip.}
13\end{figure}
14\begin{description}
15\item [Equipment]
16No specific equipment acquisition.
17\item [Personnel costs]
18The faculty members involved in the project are a professor at ENS
19Lyon (Paul Feautrier) and a research associate (CR2) at INRIA
20Rh\^one-Alpes (Christophe Alias). The non-permanent personal required
21is a PhD student that will work on network process generation from
22polyhedral loops, then on extensions to non-polyhedral loops. We are
23looking for a student with both theoretical and practical skills, that
24will be able to get a sufficient understanding of the polyhedral
25techniques and to produce a working implementation.
[53]26
[87]27The table below summarizes the man power by task for both permanent and
28non-permanent personnels. The detail by delivrables is given in
29figure~\ref{ress-detail-lip}.
30The non-permanent personnels costs represent ??\% of the personnal
31costs. The requested funding for non permanent personnels is 100\% of
32the total ANR requested funding.
[99]33    \begin{center}\input{table_lip_short.tex}\end{center}
[87]34
35\item [Subcontracting]
36No subcontracting costs.
37\item [Travel]
38The travel costs are associated to project meeting as
39well as participation to conferences. The travel costs are estimated
40to ??\% of the total requested ANR funding.
41\item [Expenses for inward billing]
42The costs justified by internal invoicing procedures are evaluated to 4\%
43of the total requested ANR funding.\\
44\end{description}
45
46
[53]47%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
48\subsection{Partner 3: \tima}
[63]49\begin{figure}\leavevmode\center
50\input{table_tima_full.tex}
51\caption{\label{ress-detail-tima}Man power in $mm$ for the delivrables of \tima.}
52\end{figure}
53\begin{description}
[57]54\item [Equipment]
55No specific equipment acquisition.
56\item [Personnel costs]
57The permanent personnels involved in the project are professor and
[119]58assistant professors (Fr\'ed\'eric P\'etrot and Olivier Muller).
[57]59All non permanent personnel are Phd students.
60Related costs are estimated in men per months.
61One phd student (Adrien Prost-Boucle), funded by french ministry of research,
[119]62will be working on the project.
[57]63One 100\% funded phd student will be hired in september 2010. A second phd student
64will be hired in september 2011, but with half-funding on the project.
65The first PhD student will mainly work on the evolution of UGH HLS tool. Thus, we
[119]66are looking for a profile with strong informatic skills and good knowledge in
[57]67computer architecture.
68The second student will mainly work on dynamic reconfiguration and HPC. The required
69profil will be more oriented on computer architecture and advances digital design.
[53]70
[57]71The table below sumarizes the man power by task for both permanent and non-permanent
[63]72personnels. The detail by delivrables is given in figure~\ref{ress-detail-tima}.
[57]73The requested funding for personnels represent 47\% of the total personnal costs.
74The requested funding for non permanent personnels is 82\% of the total ANR
75requested funding.
[99]76\begin{center}\input{table_tima_short.tex}\end{center}
[57]77\item [Subcontracting]
78No subcontracting costs.
79\item [Travel]
80The travel costs are associated to project meeting as
81well as participation to conferences. The travel costs are estimated
82to 14\% of the total requested ANR funding.
83\item [Expenses for inward billing]
84The costs justified by internal invoicing procedures are evaluated to 4\%
85of the total requested ANR funding.\\
[63]86\end{description}
[57]87
[53]88%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
89\subsection{Partner 4: \ubs}
[99]90\begin{figure}\leavevmode\center
91\input{table_ubs_full.tex}
92\caption{\label{ress-detail-ubs}Man power in $mm$ for the delivrables of \ubs.}
93\end{figure}
[53]94
[70]95\begin {description}
96\item [Equipment]
97In order to validate the design flow project, the LabSTICC  laboratory will buy FPGA developpement boards.
98The cost for these FPGA boards is estimated to 3\% of the total ANR funding.
99\item [Personnel costs]
100The faculty members involved in the project are
[119]101associate professors (Philippe COUSSY, Cyrille CHAVET) or research engineers (Dominique HELLER).
[70]102All non-permanent personnel costs are estimated in men*months
103for senior researchers (post-doc or research engineers).
[99]104
[70]105The table below sumarizes the man power by task for both permanent and non-permanent
[99]106personnels. The detail by delivrables is given in figure~\ref {ress-detail-ubs}.
[70]107The non-permanent personnels costs represent 50\% of the personnal costs.
108The requested funding for non permanent personnels is about 83\% of the total ANR
109requested funding.
[99]110\begin{center}\input{table_ubs_short.tex}\end{center}
[70]111\item [Subcontracting]
112No subcontracting costs.
113\item [Travel]
114The travel costs are associated to management and meeting as
115well as participation to conferences. The travel costs are estimated
116to 10\% of the total requested ANR funding.
117\item [Expenses for inward billing]
118The costs justified by internal invoicing procedures are evaluated to 4\%
119of the total requested ANR funding.
120\end {description}
121
122
[53]123%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
124\subsection{Partner 5: \upmc}
[58]125\begin{figure}\leavevmode\center
126\input{table_upmc_full.tex}
127\caption{\label{ress-detail-upmc}Man power in $mm$ for the delivrables of \upmc.}
128\end{figure}
129\begin{description}
130\item[Equipment]
131    No specific equipment acquisition is required for this project.
132    The costs for depreciation of workstations
133    and pre-existing FPGA boards are evaluated to 7\% of the total
134    requested ANR funding.
135\item[Personnel costs]
136    The permanent personnels involved in the project are professors or
137    assistant processors (Alain Greiner and Ivan Aug\'e).
138    All non permanent personnel costs are estimated in men*months
139    for senior researchers (post-doc or research engineers).
140    The table below sumarizes the man power by task for both permanent  and non-permanent
141    personnels. The detail by delivrables is given in figure~\ref{ress-detail-upmc}.
142    The non-permanent personnels costs represent 50\% of the personnal costs.
143    The requested funding for non permanent personnels is 79\% of the total ANR
144    requested funding.
145    \begin{center}\input{table_upmc_short.tex}\end{center}
146\item[Subcontracting]
147    No subcontracting costs.
148\item[Travel]
149    The travel costs are associated to management and coordination meeting as
150    well as participation to conferences. The travel costs are estimated
151    to 10\% of the total requested ANR funding.
152\item[Expenses for inward billing]
153    The costs justified by internal invoicing procedures are evaluated to 4\%
154    of the total requested ANR funding.
155\end{description}
[53]156
157%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[99]158\subsection{Partner 6: \xilinx}
[114]159
[99]160\begin{figure}\leavevmode\center
161\input{table_xilinx_full.tex}
162\caption{\label{ress-detail-xilinx}Man power in $mm$ for the delivrables of \xilinx.}
163\end{figure}
164\begin{description}
165\item[Equipment]
166    No specific equipment acquisition is required for this project.
167\item[Personnel costs]
168    \xilinx employees involved in the project are permanent Software Engineers.
169    The detail by delivrables is given in figure~\ref{ress-detail-xilinx} and
[114]170    a sumary by task in the following table.
[99]171    \begin{center}\input{table_xilinx_short.tex}\end{center}
172\item[Subcontracting]
173    No subcontracting costs.
174\item[Travel]
175    The travel costs are associated to project meeting as well as participation to
176    conferences. The travel costs are estimated to
177    \mustbecompleted{FIXME:\xilinx: XX\%} of the total requested ANR funding.
178\item[Expenses for inward billing] none
179\item[Other working costs] none
180\end{description}
[53]181
182%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[99]183\subsection{Partner 7: \bull}
[53]184
[114]185\begin{description}
186\item[Equipment]
187    Acquisition of a FPGA development board will represent the main equipment cost for
188    Bull in COACH. It is estimated at about 5\% (tbc) of the total funding.
189\item[Personnel costs]
190    A permanent engineer will be assigned full time to the project for a duration of 20
191    months as shown in the table below:
192    \begin{center}\input{table_bull_short.tex}\end{center}
193\item[Subcontracting]
194    No subcontracting costs.
195\item[Travel]
196    Application of a standard 10\% of the total funding to travel costs.
197\item[Expenses for inward billing]
198    Costs justified by inward billing are estimated to about 5\% of the total funding.
199\item[Other working costs] none
200\end{description}
201
202
[53]203%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[99]204\subsection{Partner 8: \thales}
[53]205\ressourcehelp
206
207%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[99]208\subsection{Partner 9: \zied}
[53]209\ressourcehelp
210
211%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[99]212\subsection{Partner 10: \navtel}
[53]213\ressourcehelp
214
Note: See TracBrowser for help on using the repository browser.