  • anr/section-4.1.tex

    r99 r105  
    11\begin{figure}\leavevmode\center
    22\includegraphics[width=.8\linewidth]{architecture-csg}
    3 \caption{\label{archi-csg} software architecture for digital system generation}
     3\caption{\label{archi-csg} Software architecture for digital system generation}
    44%\end{figure}\begin{figure}\leavevmode\center
    55\mbox{}\vspace*{1ex}\\
    66\includegraphics[width=1.0\linewidth]{architecture-hls}
    7 \caption{\label{archi-hls} software architecture of hardware accellerator synthesis}
     7\caption{\label{archi-hls} Software architecture of hardware accellerator synthesis}
    88%\end{figure}\begin{figure}\leavevmode\center
    99\mbox{}\vspace*{1ex}\\
    1010\includegraphics[width=.8\linewidth]{architecture-hpc}
    11 \caption{\label{archi-hpc} software architecture of HPC}
     11\caption{\label{archi-hpc} Software architecture of HPC}
    1212\end{figure}
    1313%FIXME: la figure ne montre que l'aspect simulation. Intégrer la partie génération (PC API, PCIX, FPGA-IP, bridge vers VCI, SoC API) serait un plus, non ?
     
    118118Figure~\ref{dependence-task} presents the tasks dependencies.
    119119"$T_N \longrightarrow T_M$" means that $T_N$ impacts the $T_M$.
    120 The more bold is the arrow, the more important is the dependency.
     120The more bold is the arrow, the more important is the impact.
    121121The graph shows:
    122122\begin{itemize}
     
    126126without $T4$ and $T5$ if we limit to digital systems without hardware
    127127accellerators.
    128 \item $T3$ strongly impacts on $T6$ but, $T3$ does not depend at all on
     128\item $T3$ strongly impacts $T6$ but, $T3$ does not depend at all on
    129129$T6$. So demonstrators ($T7$) of embedded system would not be impacted if
    130130$T6$ would fail. 
     
    132132the COACH project.
    133133\item The demonstrators developped in $T7$, of course, strongly depends on the achievements
    134 of the prvious tasks ($T2$, $T3$, $T4$, $T5$, $T6$).
     134of the previous tasks ($T2$, $T3$, $T4$, $T5$, $T6$).
    135135\item $T8$ and $T1$ respectively depends on and impacts all the other tasks.
    136136\end{itemize}
    137137This organisation offers enough robustness to insure the success of the
    138138project except for the specification task $T2$.
    139 \\
    140139The only critical task in this chart is $T2$. \label{xcoach-problem}
    141140However, the partners met