Changeset 164


Ignore:
Timestamp:
Feb 15, 2010, 11:21:55 AM (15 years ago)
Author:
coach
Message:

IA: fin de la mise en page

File:
1 edited

Legend:

Unmodified
Added
Removed
  • anr/section-7.tex

    r162 r164  
    1414  and good knowledge in computer architecture.
    1515  \parlf
    16   The table below summarizes the manpower in mam-months by tasks for both permanent and
     16  The table below summarizes the manpower in \hommemois by tasks for both permanent and
    1717  non-permanent personnels. The detail by deliverables is given in
    1818  figure~\ref{table-livrables-1}.
     
    7474  (Fr\'ed\'eric P\'etrot and Olivier Muller).
    7575  The non permanent personnels are Phd students and post-doc researchers.
    76   Related costs are estimated in men per months.
     76  Related costs are estimated in \hommemois.
    7777  One phd student (Adrien Prost-Boucle), funded by the french ministry of research, will
    7878  be working on the project.
     
    112112  The faculty members involved in the project are associate professors (Philippe COUSSY,
    113113  Cyrille CHAVET) or research engineers (Dominique HELLER). All non-permanent personnel
    114   costs are estimated in men*months for senior researchers (post-doc or research
     114  costs are estimated in \hommemois for senior researchers (post-doc or research
    115115  engineers).
    116116  \parlf
     
    193193\item[Personnel costs]
    194194    A permanent engineer will be assigned full time to the project for a duration of 20
    195     months as shown in the table below:
     195    months as shown in the table below that gives the man power in \hommemois:
    196196    \begin{center}\input{table_bull_full.tex}\end{center}
    197197\item[Subcontracting]
     
    214214\item[Personnel costs]
    215215    The effort to adapt SPEAR DE to generate the input files to COACH framework is
    216     estimated to 13 man.months.
    217     The effort to describe and develop the application is estimated to 14 man.month.
    218     Finally we need one man.month for the partiticipation to the global specification in task 2.
     216    estimated to 13 \hommemois.
     217    The effort to describe and develop the application is estimated to 14 \hommemois.
     218    Finally we need one \hommemois for the partiticipation to the global specification in task 2.
     219    This is sumarized in the table below:
    219220    \begin{center}\input{table_thales_full.tex}\end{center}
    220221\item[Subcontracting]
     
    244245    A permanent engineer will be assigned on average 1/3 time for
    245246        all the duration of the project.
    246     The table below shows the estimated manpower cost in months for the deliverables.
     247    The table below shows the estimated manpower cost in \hommemois for the deliverables.
    247248    \begin{center}\input{table_navtel_full.tex}\end{center}
    248249\item[Subcontracting]
     
    276277\begin{minipage}[b]{.47\linewidth}\center
    277278\input{table_ubs_full.tex}\vspace{.5ex}\\     \ubs    \vspace{2.5ex}\\
    278 \input{table_thales_full.tex}\vspace{.5ex}\\  \thales \\
     279%\input{table_thales_full.tex}\vspace{.5ex}\\  \thales \\
    279280\end{minipage}\hfill\begin{minipage}[b]{.47\linewidth}\center
    280281\input{table_upmc_full.tex}\vspace{.5ex} \\   \upmc
Note: See TracChangeset for help on using the changeset viewer.