    r174 r192  
    3434
    3535\subsection{Partner 2: \lip}
    36 \begin{figure}\leavevmode\center
    37 \input{table_lip_full.tex}
    38 \caption{\label{ress-detail-lip}Man power in $mm$ for the deliverables of \lip.}
    39 \end{figure}
     36
    4037\begin{description}
    4138\item [Equipment]
     
    5855  the personnal costs. The requested funding for non
    5956  permanent personnels is 100\% of the total ANR requested funding.
    60   \begin{center}\input{table_lip_short.tex}\end{center}
     57  \begin{center}\input{table_inria_compsys_full.tex}\end{center}
    6158\item [Subcontracting]
    6259  No subcontracting costs.
     
    238235\subsection{Partner 9: \zied}
    239236
    240   \begin{center}\input{table_zied_full.tex}\end{center}
     237\begin{description}
     238\item[Equipment]
     239    No equipement costs.
     240\item[Personnel costs]
     241    The effort to define SoC architecture and adapt eFPGA interface to generate is
     242    estimated to 9.6 \hommemois.
     243    The effort to develop demonstrator and to extract eFPGA timining characteristics is
     244    estimated to 4.8 \hommemois.
     245    Finally we need one 3.6 man.month for the evaluation of the FLEXRAS solution.
     246    The table below summarizes the these manpower costs in \hommemois for the deliverables
     247    and by tasks.
     248    \begin{center}\input{table_zied_full.tex}\end{center}
     249\item[Subcontracting]
     250    No subcontracting costs.
     251\item[Travel]
     252    No travel costs.
     253\item[Expenses for inward billing] none
     254\item[Other working costs] none
     255\end{description}
    241256
    242257%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
     
    251266    A permanent engineer will be assigned on average 1/3 time for
    252267        all the duration of the project.
    253     The table below shows the estimated manpower cost in \hommemois for the deliverables.
     268    The table below shows the estimated manpower cost in \hommemois for the deliverables
     269    and by tasks.
    254270    \begin{center}\input{table_navtel_full.tex}\end{center}