anr/section-ressources.tex
r320 r325 109 109 No specific equipment acquisition. 110 110 \item [Personnel costs] 111 The permanent personnels involved in the project are professor and ass istantprofessor111 The permanent personnels involved in the project are professor and associate professor 112 112 (Fr\'ed\'eric P\'etrot and Olivier Muller). 113 113 The non permanent personnels are Phd students and post-doc researchers. 114 114 Related costs are estimated in \hommemois. 115 One phd student (Adrien Prost-Boucle), funded by the french ministry of research, will115 One phd student (Adrien Prost-Boucle), funded by the French ministry of research, will 116 116 be working on the project. 117 One 100\% funded phd student will be hired in september 2010. A post-doc researcher will118 be hired at the end of 201 1 for one year and an half.117 One 100\% funded phd student will be hired in September 2011. A post-doc researcher will 118 be hired at the end of 2012 for one year. 119 119 The PhD student will mainly work on the evolution of UGH HLS tool. Thus, we are looking 120 120 for a profile with strong informatic skills and good knowledge in computer architecture. 121 The post-doc will mainly work on FPGA reconfiguration andHPC. The required profile121 The post-doc will mainly work on HPC. The required profile 122 122 will be more oriented on computer architecture and advanced digital design. 123 123 \parlf 124 The table below sum arizes the man power in \hommemois by tasks for both permanent and124 The table below summarizes the man power in \hommemois by tasks for both permanent and 125 125 non-permanent personnels. The detail by deliverables is given in 126 126 figure~\ref{table-livrables-1}. 127 The requested funding for personnels represent 50\% of the total personnal costs.128 The requested funding for non permanent personnels is 8 5\% of the total ANR requested127 The effort of permanent personnels represents 50\% of the total effort. 128 The requested funding for non permanent personnels is 86\% of the total ANR requested 129 129 funding. 130 130 \begin{center}\input{table_tima_short.tex}\end{center} … … 133 133 \item [Travel] 134 134 The travel costs are associated to project meeting as well as participation to 135 conferences. The travel costs are estimated to 1 1\% of the total requested ANR funding.135 conferences. The travel costs are estimated to 10\% of the total requested ANR funding. 136 136 \item [Expenses for inward billing] 137 137 The costs justified by internal invoicing procedures are evaluated to 4\% of the total
Note: See TracChangeset
for help on using the changeset viewer.