Changeset 376


Ignore:
Timestamp:
Feb 15, 2011, 1:33:40 PM (13 years ago)
Author:
coach
Message:

minor Paul

M anr/section-dissemination.tex

File:
1 edited

Legend:

Unmodified
Added
Removed
  • anr/section-dissemination.tex

    r368 r376  
    2121\subsection{Dissemination}
    2222
    23 The COACH project will bring new scientific results in various fields, such as high level synthesis,
     23The COACH project will generate new scientific results in various fields, such as high level synthesis,
    2424hardware/software codesign, virtual prototyping, hardware oriented compilation techniques,
    2525automatic parallelization, etc. These results will be published in relevant International
    26 Conferences, namely DATE, DAC, or ICCAD.
     26Conferences, for instance DATE, DAC, or ICCAD.
    2727\\
    2828More generally, the COACH infrastructure and the design flow supported by the COACH
     
    3939On the standardization side, some effort will be made for analysing how the work around IP-XACT
    4040could be donated for the evolution of the IEEE 1685 standard. \mds is board member of
    41 Accellera, TRT, TIMA and LIP6 are members, so we'll try to have some influence and at least
     41Accellera, TRT, TIMA and LIP6 are members, so we will try to have some influence and at least
    4242communicate on the fact that our solutions will be compatible with the standard.
    4343
    4444\subsection{Industrial exploitation of results}
    4545
    46 The main goal of the COACH project is to help SMEs (Small and Medium Enterprises) and even small design team in bigger entities
     46The main goal of the COACH project is to help SMEs (Small and Medium Enterprises) and even small design team in larger entities
    4747to enter the world of MPSoC technologies. For small companies or design services, the cost is a primary concern.
    48 Moreover, these companies have not always in-home expertise in hardware design and VHDL modelling.
     48Moreover, these companies seldom have in-home expertise in hardware design and VHDL modelling.
    4949As the fabrication costs of an ASIC is generally too high for SMEs, the COACH project focus
    5050on FPGA technologies. Regarding the design tools, the cost of advanced ESL (Electronic System Design)
     
    7474synthesis tools developed in the COACH project.
    7575\item
    76 \mds will propose a commercial version of COACH, integrated into \mds tool suite and compatible with a standard IP-XACT flow.
     76\mds will propose a commercial version of COACH, integrated into an \mds tool suite and compatible with a standard IP-XACT flow.
    7777This version will integrate some generic features, already available for
    78 production (some of them from standard \mds pack, some other developed in
     78production (some of them from a standard \mds pack, some other developed in
    7979COACH). Other COACH features will have to be tailored for the specifics of the
    8080customer framework and will generate service business.
     
    9393We will collaborate in experiments for the integration of High Level Synthesis
    9494engines into IP-XACT based flow.  This point will be very valuable because more
    95 and more system integrators are using or considering to use HLS in their flow
     95and more system integrators are using or considering the use of HLS in their development flow
    9696(e.g. Astrium, Airbus, etc.).
    9797\item
    9898\mds has already a leading position in the usage of IP-XACT standard for
    9999managing innovative SoC design methodologies. This project will allow to keep
    100 the advance in regards with competition by anticipating the next generation
     100this competitive advance by anticipating the next generation
    101101platforms hosting multi-cores and programmable logic for coprocessors.
    102102\item
    103103HPC is a topic that was not covered yet by \mds with its customers. Thanks to
    104104this project, \mds will collaborate with BULL on this point and this will open
    105 us doors for new customers market.
     105doors for new customers market.
    106106\item
    107107This project has been set up for maximizing the industrial exploitation of results.
     
    119119\subsubsection*{Partner: \textit{\bull}}
    120120\noindent
    121 The Bull team participating to COACH is from the Server Design and Development Division,
    122 who is in charge of developing hardware for open servers (e.g.: NovaSacle, Bullion) and
     121The Bull team participating in COACH is from the Server Design and Development Division,
     122which is in charge of developing hardware for open servers (e.g.: NovaSacle, Bullion) and
    123123HPC solutions. With this participation, Bull demonstrates its high interest in the outcome of
    124124COACH. Effectively, it is now commonly recognized that the future of HPC will be based
     
    143143TRT (Thales Research and Technology) has the mission to assess and de-risk the emerging
    144144technologies in its domains of expertise. Specifically in COACH, the studied technology is
    145 a method and associated tools to make the bridge between application capture at system
     145a method and associated tools to bridge the gap between application capture at system
    146146level and the implementation on heterogeneous distributed computing architectures. The
    147147main stake for Thales behind this is the future design process that will be applied to its
    148 system teams in the future for the computation-intensive sensor applications. In a context
    149 of very instable market of tools for parallel programming, it is important to experiment
     148system teams for computation-intensive sensor applications. In a context
     149of very unstable market of tools for parallel programming, it is important to experiment
    150150and demonstrate the candidate technologies.
    151151\\
     
    179179
    180180\subsection{Management of Intellectual Property}
    181 A global consortium agreement will be defined during the first six monts of the project.
     181A global consortium agreement will be defined during the first six months of the project.
    182182As already stated, the COACH project has been prepared during one year by a monthly meeting
    183183involving the five academic partners. The general free software policy described in the
Note: See TracChangeset for help on using the changeset viewer.