1\def\resstablestyletitle#1{\begin{tiny}\textbf{\textit{#1}}\end{tiny}}
2
3%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
4\subsection{Partner 1: \irisa}
5
6\begin{figure}\leavevmode\center
7\input{table_inria_cairn_full.tex}
8\caption{\label{ress-detail-irisa}Man power in $mm$ for the delivrables of \irisa.}
9\end{figure}
10\begin{description}
11\item [Equipment]
12No specific equipment acquisition.
13\item [Personnel costs] The faculty members involved in the project
14  are François Charot (INRIA researcher) Steven Derrien (associate
15  professor) and Charles Wagner (research engineer). The non-permanent
16  personal required is a PhD student that will mainly work on ASIP
17  generation. We are looking for profile with strong informatic skills
18  and good knowledge in computer architecture.
19
20The table below summarizes the man power by task for both permanent and
21non-permanent personnels. The detail by delivrables is given in
22figure~\ref{ress-detail-irisa}.
23The non-permanent personnels costs represent ??\% of the personnal
24costs. The requested funding for non permanent personnels is 100\% of
25the total ANR requested funding.
26    \begin{center}\input{table_inria_cairn_short.tex}\end{center}
27
28\item [Subcontracting]
29No subcontracting costs.
30\item [Travel]
31The travel costs are associated to project meeting as
32well as participation to conferences. The travel costs are estimated
33to ??\% of the total requested ANR funding.
34\item [Expenses for inward billing]
35The costs justified by internal invoicing procedures are evaluated to 4\%
36of the total requested ANR funding.\\
37\end{description}
38
39
40\subsection{Partner 2: \lip}
41
42%\ressourcehelp
43\begin{figure}\leavevmode\center
44\input{table_lip_full.tex}
45\caption{\label{ress-detail-lip}Man power in $mm$ for the delivrables of \lip.}
46\end{figure}
47\begin{description}
48\item [Equipment]
49No specific equipment acquisition.
50\item [Personnel costs]
51The faculty members involved in the project are a professor at ENS
52Lyon (Paul Feautrier) and a research associate (CR2) at INRIA
53Rh\^one-Alpes (Christophe Alias). The non-permanent personal required
54is a PhD student that will work on network process generation from
55polyhedral loops, then on extensions to non-polyhedral loops. We are
56looking for a student with both theoretical and practical skills, that
57will be able to get a sufficient understanding of the polyhedral
58techniques and to produce a working implementation.
59
60The table below summarizes the man power by task for both permanent and
61non-permanent personnels. The detail by delivrables is given in
62figure~\ref{ress-detail-lip}.
63The non-permanent personnels costs represent ??\% of the personnal
64costs. The requested funding for non permanent personnels is 100\% of
65the total ANR requested funding.
66    \begin{center}\input{table_lip_short.tex}\end{center}
67
68\item [Subcontracting]
69No subcontracting costs.
70\item [Travel]
71The travel costs are associated to project meeting as
72well as participation to conferences. The travel costs are estimated
73to ??\% of the total requested ANR funding.
74\item [Expenses for inward billing]
75The costs justified by internal invoicing procedures are evaluated to 4\%
76of the total requested ANR funding.\\
77\end{description}
78
79
80%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
81\subsection{Partner 3: \tima}
82\begin{figure}\leavevmode\center
83\input{table_tima_full.tex}
84\caption{\label{ress-detail-tima}Man power in $mm$ for the delivrables of \tima.}
85\end{figure}
86\begin{description}
87\item [Equipment]
88No specific equipment acquisition.
89\item [Personnel costs]
90The permanent personnels involved in the project are professor and
91assistant professors (Fr\'ed\'eric P\'etrot and Olivier Muller).
92All non permanent personnel are Phd students.
93Related costs are estimated in men per months.
94One phd student (Adrien Prost-Boucle), funded by french ministry of research,
95will be working on the project.
96One 100\% funded phd student will be hired in september 2010. A second phd student
97will be hired in september 2011, but with half-funding on the project.
98The first PhD student will mainly work on the evolution of UGH HLS tool. Thus, we
99are looking for a profile with strong informatic skills and good knowledge in
100computer architecture.
101The second student will mainly work on dynamic reconfiguration and HPC. The required
102profil will be more oriented on computer architecture and advances digital design.
103
104The table below sumarizes the man power by task for both permanent and non-permanent
105personnels. The detail by delivrables is given in figure~\ref{ress-detail-tima}.
106The requested funding for personnels represent 47\% of the total personnal costs.
107The requested funding for non permanent personnels is 82\% of the total ANR
108requested funding.
109\begin{center}\input{table_tima_short.tex}\end{center}
110\item [Subcontracting]
111No subcontracting costs.
112\item [Travel]
113The travel costs are associated to project meeting as
114well as participation to conferences. The travel costs are estimated
115to 14\% of the total requested ANR funding.
116\item [Expenses for inward billing]
117The costs justified by internal invoicing procedures are evaluated to 4\%
118of the total requested ANR funding.\\
119\end{description}
120
121%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
122\subsection{Partner 4: \ubs}
123\begin{figure}\leavevmode\center
124\input{table_ubs_full.tex}
125\caption{\label{ress-detail-ubs}Man power in $mm$ for the delivrables of \ubs.}
126\end{figure}
127
128\begin {description}
129\item [Equipment]
130In order to validate the design flow project, the LabSTICC  laboratory will buy FPGA developpement boards.
131The cost for these FPGA boards is estimated to 3\% of the total ANR funding.
132\item [Personnel costs]
133The faculty members involved in the project are
134associate professors (Philippe COUSSY, Cyrille CHAVET) or research engineers (Dominique HELLER).
135All non-permanent personnel costs are estimated in men*months
136for senior researchers (post-doc or research engineers).
137
138The table below sumarizes the man power by task for both permanent and non-permanent
139personnels. The detail by delivrables is given in figure~\ref {ress-detail-ubs}.
140The non-permanent personnels costs represent 50\% of the personnal costs.
141The requested funding for non permanent personnels is about 83\% of the total ANR
142requested funding.
143\begin{center}\input{table_ubs_short.tex}\end{center}
144\item [Subcontracting]
145No subcontracting costs.
146\item [Travel]
147The travel costs are associated to management and meeting as
148well as participation to conferences. The travel costs are estimated
149to 10\% of the total requested ANR funding.
150\item [Expenses for inward billing]
151The costs justified by internal invoicing procedures are evaluated to 4\%
152of the total requested ANR funding.
153\end {description}
154
155
156%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
157\subsection{Partner 5: \upmc}
158\begin{figure}\leavevmode\center
159\input{table_upmc_full.tex}
160\caption{\label{ress-detail-upmc}Man power in $mm$ for the delivrables of \upmc.}
161\end{figure}
162\begin{description}
163\item[Equipment]
164    No specific equipment acquisition is required for this project.
165    The costs for depreciation of workstations
166    and pre-existing FPGA boards are evaluated to 7\% of the total
167    requested ANR funding.
168\item[Personnel costs]
169    The permanent personnels involved in the project are professors or
170    assistant processors (Alain Greiner and Ivan Aug\'e).
171    All non permanent personnel costs are estimated in men*months
172    for senior researchers (post-doc or research engineers).
173    The table below sumarizes the man power by task for both permanent  and non-permanent
174    personnels. The detail by delivrables is given in figure~\ref{ress-detail-upmc}.
175    The non-permanent personnels costs represent 50\% of the personnal costs.
176    The requested funding for non permanent personnels is 79\% of the total ANR
177    requested funding.
178    \begin{center}\input{table_upmc_short.tex}\end{center}
179\item[Subcontracting]
180    No subcontracting costs.
181\item[Travel]
182    The travel costs are associated to management and coordination meeting as
183    well as participation to conferences. The travel costs are estimated
184    to 10\% of the total requested ANR funding.
185\item[Expenses for inward billing]
186    The costs justified by internal invoicing procedures are evaluated to 4\%
187    of the total requested ANR funding.
188\end{description}
189
190%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
191\subsection{Partner 6: \xilinx}
192
193\begin{figure}\leavevmode\center
194\input{table_xilinx_full.tex}
195\caption{\label{ress-detail-xilinx}Man power in $mm$ for the delivrables of \xilinx.}
196\end{figure}
197\begin{description}
198\item[Equipment]
199    No specific equipment acquisition is required for this project.
200\item[Personnel costs]
201    \xilinx employees involved in the project are permanent Software Engineers.
202    The detail by delivrables is given in figure~\ref{ress-detail-xilinx} and
203    a sumary by task in the following table.
204    \begin{center}\input{table_xilinx_short.tex}\end{center}
205\item[Subcontracting]
206    No subcontracting costs.
207\item[Travel]
208    The travel costs are associated to project meeting as well as participation to
209    conferences. The travel costs are estimated to
210    \mustbecompleted{FIXME:\xilinx: XX\%} of the total requested ANR funding.
211\item[Expenses for inward billing] none
212\item[Other working costs] none
213\end{description}
214
215%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
216\subsection{Partner 7: \bull}
217
218\begin{description}
219\item[Equipment]
220    Acquisition of a FPGA development board will represent the main equipment cost for
221    Bull in COACH. It is estimated at about 5\% (tbc) of the total funding.
222\item[Personnel costs]
223    A permanent engineer will be assigned full time to the project for a duration of 20
224    months as shown in the table below:
225    \begin{center}\input{table_bull_short.tex}\end{center}
226\item[Subcontracting]
227    No subcontracting costs.
228\item[Travel]
229    Application of a standard 10\% of the total funding to travel costs.
230\item[Expenses for inward billing]
231    Costs justified by inward billing are estimated to about 5\% of the total funding.
232\item[Other working costs] none
233\end{description}
234
235
236%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
237\subsection{Partner 8: \thales}
238\ressourcehelp
239
240%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
241\subsection{Partner 9: \zied}
242\ressourcehelp
243
244%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
245\subsection{Partner 10: \navtel}
246\ressourcehelp
247
Note: See TracBrowser for help on using the repository browser.