Changeset 155 for anr/section-7.tex


Ignore:
Timestamp:
Feb 15, 2010, 9:57:43 AM (15 years ago)
Author:
coach
Message:

INRIA/COMPSYS -> LIP

File:
1 edited

Legend:

Unmodified
Added
Removed
  • anr/section-7.tex

    r152 r155  
    66\begin{figure}\leavevmode\center
    77\input{table_inria_cairn_full.tex}
    8 \caption{\label{ress-detail-irisa}Man power in $mm$ for the delivrables of \irisa.}
     8\caption{\label{ress-detail-irisa}Man power in $mm$ for the deliverables of \irisa.}
    99\end{figure}
    1010\begin{description}
     
    1919
    2020The table below summarizes the manpower by tasks for both permanent and non-permanent
    21 personnels. The detail by delivrables is given in figure~\ref{ress-detail-irisa}.
     21personnels. The detail by deliverables is given in figure~\ref{ress-detail-irisa}.
    2222The non-permanent personnels costs represent \mustbecompleted{??\%} of the personnal
    2323costs. The requested funding for non permanent personnels is 100\% of
     
    4343No specific equipment acquisition.
    4444\item [Personnel costs]
    45 The faculty members involved in the project are a professor at ENS
     45The faculty members involved in the project are an emeritus professor at ENS
    4646Lyon (Paul Feautrier) and a research associate (CR2) at INRIA
    4747Rh\^one-Alpes (Christophe Alias). The non-permanent personal required
     
    5252techniques and to produce a working implementation.
    5353
    54 The table below summarizes the man power by delivrables and tasks for both permanent and
     54The table below summarizes the man power by deliverables and tasks for both permanent and
    5555non-permanent personnels.
    5656The non-permanent personnels costs represent \mustbecompleted{??\%} of the personnal
     
    7575\begin{figure}\leavevmode\center
    7676\input{table_tima_full.tex}
    77 \caption{\label{ress-detail-tima}Man power in $mm$ for the delivrables of \tima.}
     77\caption{\label{ress-detail-tima}Man power in $mm$ for the deliverables of \tima.}
    7878\end{figure}
    7979\begin{description}
     
    9797
    9898The table below sumarizes the man power by task for both permanent and non-permanent
    99 personnels. The detail by delivrables is given in figure~\ref{ress-detail-tima}.
     99personnels. The detail by deliverables is given in figure~\ref{ress-detail-tima}.
    100100The requested funding for personnels represent 50\% of the total personnal costs.
    101101The requested funding for non permanent personnels is 85\% of the total ANR
     
    117117\begin{figure}\leavevmode\center
    118118\input{table_ubs_full.tex}
    119 \caption{\label{ress-detail-ubs}Man power in $mm$ for the delivrables of \ubs.}
     119\caption{\label{ress-detail-ubs}Man power in $mm$ for the deliverables of \ubs.}
    120120\end{figure}
    121121
     
    131131
    132132The table below sumarizes the man power by task for both permanent and non-permanent
    133 personnels. The detail by delivrables is given in figure~\ref {ress-detail-ubs}.
     133personnels. The detail by deliverables is given in figure~\ref {ress-detail-ubs}.
    134134The non-permanent personnels costs represent 50\% of the personnal costs.
    135135The requested funding for non permanent personnels is about 83\% of the total ANR
     
    152152\begin{figure}\leavevmode\center
    153153\input{table_upmc_full.tex}
    154 \caption{\label{ress-detail-upmc}Man power in $mm$ for the delivrables of \upmc.}
     154\caption{\label{ress-detail-upmc}Man power in $mm$ for the deliverables of \upmc.}
    155155\end{figure}
    156156\begin{description}
     
    166166    for senior researchers (post-doc or research engineers).
    167167    The table below sumarizes the man power by task for both permanent  and non-permanent
    168     personnels. The detail by delivrables is given in figure~\ref{ress-detail-upmc}.
     168    personnels. The detail by deliverables is given in figure~\ref{ress-detail-upmc}.
    169169    The non-permanent personnels costs represent 50\% of the personnal costs.
    170170    The requested funding for non permanent personnels is 79\% of the total ANR
     
    187187\begin{figure}\leavevmode\center
    188188\input{table_xilinx_full.tex}
    189 \caption{\label{ress-detail-xilinx}Man power in $mm$ for the delivrables of \xilinx.}
     189\caption{\label{ress-detail-xilinx}Man power in $mm$ for the deliverables of \xilinx.}
    190190\end{figure}
    191191\begin{description}
     
    194194\item[Personnel costs]
    195195    \xilinx employees involved in the project are permanent Software Engineers.
    196     The detail by delivrables is given in figure~\ref{ress-detail-xilinx} and
     196    The detail by deliverables is given in figure~\ref{ress-detail-xilinx} and
    197197    a sumary by task in the following table.
    198198    \begin{center}\input{table_xilinx_short.tex}\end{center}
     
    267267    A permanent engineer will be assigned on average 1/3 time for
    268268        all the duration of the project.
    269     The table below shows the estimated manpower cost in months for the delivrables.
     269    The table below shows the estimated manpower cost in months for the deliverables.
    270270    \begin{center}\input{table_navtel_full.tex}\end{center}
    271271\item[Subcontracting]
Note: See TracChangeset for help on using the changeset viewer.