Changeset 278 for anr/section-7.tex


Ignore:
Timestamp:
Nov 24, 2010, 12:14:38 AM (14 years ago)
Author:
coach
Message:

Reduced the task number. Suppressed xilinx, navtel and flexra. Added mds.

File:
1 edited

Legend:

Unmodified
Added
Removed
  • anr/section-7.tex

    r268 r278  
    169169
    170170%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
    171 \subsection{Partner 6: \xilinx}
    172 
     171\subsection{Partner 6: \mds}
     172
     173\begin{ADDEDENV}
    173174\begin{description}
    174175\item[Equipment]
     
    178179  The man power detail in \hommemois by deliverables is given in
    179180  figure~\ref{table-livrables-1} and a sumary by task in the following table.
    180   \begin{center}\input{table_xilinx_short.tex}\end{center}
     181  \begin{center}\input{table_mds_short.tex}\end{center}
    181182\item[Subcontracting]
    182183  No subcontracting costs.
     
    187188\item[Other working costs] none
    188189\end{description}
     190\end{ADDEDENV}
    189191
    190192%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
     
    234236
    235237%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
    236 \subsection{Partner 9: \zied}
    237 
    238 \begin{description}
    239 \item[Equipment]
    240     No equipement costs.
    241 \item[Personnel costs]
    242     The effort to define SoC architecture and adapt eFPGA interface to generate is
    243     estimated to 9.6 \hommemois.
    244     The effort to develop demonstrator and to extract eFPGA timining characteristics is
    245     estimated to 4.8 \hommemois.
    246     Finally we need one 3.6 man.month for the evaluation of the FLEXRAS solution.
    247     The table below summarizes the these manpower costs in \hommemois for the deliverables
    248     and by tasks.
    249     \begin{center}\input{table_zied_full.tex}\end{center}
    250 \item[Subcontracting]
    251     No subcontracting costs.
    252 \item[Travel]
    253     No travel costs.
    254 \item[Expenses for inward billing] none
    255 \item[Other working costs] none
    256 \end{description}
    257 
    258 %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
    259 \subsection{Partner 10: \navtel}
    260 
    261 \begin{description}
    262 \item[Equipment]
    263     Navtel will use FPGA board with ARM processors for the validation.
    264     The costs for depreciation of the board and the instrument of test
    265     are evaluated to 7\% of the total requested ANR funding.
    266 \item[Personnel costs]
    267     A permanent engineer will be assigned on average 1/3 time for
    268         all the duration of the project.
    269     The table below shows the estimated manpower cost in \hommemois for the deliverables
    270     and by tasks.
    271     \begin{center}\input{table_navtel_full.tex}\end{center}
    272 \item[Subcontracting]
    273     No subcontracting costs.
    274 \item[Travel]
    275     The travel costs are associated to meeting, plenaries as well as participation to
    276     conferences. The travel costs are estimated to 3 k\euro.
    277 \item[Expenses for inward billing] none
    278 \item[Other working costs] none
    279 \end{description}
    280238%
    281239\begin{landscape}
     
    286244\begin{minipage}[b]{.47\linewidth}\center
    287245\input{table_inria_cairn_full.tex}\vspace{.5ex}\\  \irisa  \vspace{2.5ex}\\
    288 \input{table_xilinx_full.tex}\vspace{.5ex}\\       \xilinx\\
     246\input{table_mds_full.tex}\vspace{.5ex}\\       \mds \\
    289247\end{minipage}\hfill\begin{minipage}[b]{.47\linewidth}\center
    290248\input{table_tima_full.tex}\vspace{.5ex} \\ \tima
Note: See TracChangeset for help on using the changeset viewer.