Ignore:
Timestamp:
Feb 8, 2011, 1:10:35 AM (14 years ago)
Author:
coach
Message:

ia: prerelease-2.

File:
1 edited

Legend:

Unmodified
Added
Removed
  • anr/section-ressources.tex

    r360 r361  
    127127\ressourcesForAcademic
    128128  {upmc}
    129   { In order to validate the COACH design flow, \upmc will buy FPGA development
    130     boards (especially 1  PCI/E FPGA \xilinx board).
    131     The cost for these boards is estimated to 4500 \euro (3\% of the total ANR funding).}
    132   {{\upmc}{52}{24}{Alain Greiner and Ivan Aug\'e}{87}{
     129  {}
     130  {{\upmc}{52}{24}{Alain Greiner and Ivan Aug\'e}{88}{
    133131     We are looking for a profile with strong skills in SW development and good
    134132     knowledge in SoC design and virtual prototyping.
    135133   }}
    136   {7}{3.5}
     134  {8}{3.5}
    137135%
    138136% \begin{description}
     
    169167\ressourcesForAcademic
    170168  {ubs}
    171   { In order to validate the design flow project, the Lab-STICC laboratory will buy FPGA
    172     development boards.  The cost for these FPGA boards is estimated to 3\% of the total
    173     ANR funding.
    174     \mustbecompleted{INCOHERENCE avec SITE ANR}
    175   }
     169  {}
    176170  {{\ubs}{48}{24}{Philippe COUSSY, Cyrille CHAVET and Dominique HELLER}{83}{
    177171   \mustbecompleted{\\UBS: A) manque 1 profil ici, B) dans annexe 7.2 il ne faut que 5
     
    215209\ressourcesForAcademic
    216210 {inria_compsys}{}
    217  {{\lip}{46}{22}{Christophe Alias and Paul Feautrier}{100}{
     211 {{\lip}{46}{21}{Christophe Alias and Paul Feautrier}{\mustbecompleted{100}}{
    218212   \\We are looking for a candidate with both theoretical and
    219213   practical skills, that will be able to get a sufficient
    220214   understanding of the polyhedral techniques.
    221    \mustbecompleted{\\LIP: DANS FIG.8 vous avez 28 hm. 46-28=18 --> 40\%\\
    222    IL FAUT ETRE <= 50\%, le max de non permanent est 23.}
    223    \mustbecompleted{\\LIP: Vous n'etes dans aucuns projets annexe 7.3 ?}
    224215   \mustbecompleted{\\LIP: ./gantt < anr.gant\\
    225216   \t WARNING: lip       :D432 probleme sur l'an 2 (in table=7.0, in gantt=6.0 \\
     
    227218   \t ERROR:   lip       :D730 probleme sur l'an 3 (in table=0.0, in gantt=3.0}
    228219   }}
    229  {\mustbecompleted{(LIP: ca fait beaucoup) }20}{4}
     220 {12}{4}
    230221%
    231222% \begin{description}
     
    315306    We are looking for a profile with strong skills in SW development and good
    316307    knowledge in computer architecture.
    317 %   \mustbecompleted{\\IRISA figure 8 vous avez 18 hm vous devez avoir 22.}
    318 %   \mustbecompleted{\\IRISA: Vous n'etes dans aucuns projets annexe 7.3 ?}%
    319 %   \mustbecompleted{\\IRISA: ./gantt < anr.gant\\
    320 %     \t ERROR:   inria     :D420 probleme sur l'an 3 (in table=0.0, in gantt=3.0}
     308   \mustbecompleted{\\IRISA figure 8 vous avez 18 hm vous devez avoir au moins 23.}
    321309    }}
    322310 {10}{4}
     
    355343\ressources
    356344  {bull}
    357   { Acquisition of a FPGA development board will represent the main equipment cost for
    358     Bull in COACH. It is estimated at about 5\% (tbc) of the total funding.
    359     \mustbecompleted{INCOHERENCE avec SITE ANR}
    360     }
     345  { The design of FPGA board (s) will represent the main equipment cost for Bull
     346    in COACH. It is estimated at about 10 k\euro (about 12\% of the total
     347    requested ANR funding) representing the re-design/adaptation of an
     348    existing FPGA board (the SAM "Simulation Accelerated Module" board).}
    361349  {
    362350    The man power detail in \hommemois by deliverables is given in
     
    392380  {thales}
    393381  { In order to validate the design flow,TRT will buy FPGA developpement boards. The cost
    394     for these FPGA boards is estimated to 11 k\euro (6\% of the total ANR funding).
    395     \mustbecompleted{INCOHERENCE avec SITE ANR}
    396     }
     382    for these FPGA boards is estimated to 11 k\euro (6\% of the total ANR funding).}
    397383  { The man power detail in \hommemois by deliverables is given in
    398     annexe~\ref{table-livrables-thales} (page \pageref{table-livrables-thales}).
     384    annexe~\ref{table-livrables-thales} (page \pageref{table-livrables-thales})
    399385    and a summary by task in the following table.
    400     \thales employees involved in the project are a manager for 18 \hommemois
    401     and an engineer  for 18 \hommemois.}
     386    \thales employees involved in the project are a manager for 7 \hommemois
     387    and an engineer  for 8 \hommemois and a PHD candidate for 21 \hommemois}
    402388  {5}{}
    403389
Note: See TracChangeset for help on using the changeset viewer.