source: anr/section-7.tex @ 121

Last change on this file since 121 was 121, checked in by coach, 14 years ago

FC: mise à jour partie moyens INRIA/CAIRN

File size: 10.4 KB
RevLine 
[53]1\def\resstablestyletitle#1{\begin{tiny}\textbf{\textit{#1}}\end{tiny}}
2
3%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[121]4\subsection{Partner 1: \irisa}
[53]5
[121]6\begin{figure}\leavevmode\center
7\input{table_inria_cairn_full.tex}
8\caption{\label{ress-detail-irisa}Man power in $mm$ for the delivrables of \irisa.}
9\end{figure}
10\begin{description}
11\item [Equipment]
12No specific equipment acquisition.
13\item [Personnel costs] The faculty members involved in the project
14  are François Charot (INRIA researcher) Steven Derrien (associate
15  professor) and Charles Wagner (research engineer). The non-permanent
16  personal required is a PhD student that will mainly work on ASIP
17  generation. We are looking for profile with strong informatic skills
18  and good knowledge in computer architecture.
[120]19
[121]20The table below summarizes the man power by task for both permanent and
21non-permanent personnels. The detail by delivrables is given in
22figure~\ref{ress-detail-irisa}.
23The non-permanent personnels costs represent ??\% of the personnal
24costs. The requested funding for non permanent personnels is 100\% of
25the total ANR requested funding.
26    \begin{center}\input{table_inria_cairn_short.tex}\end{center}
[120]27
[121]28\item [Subcontracting]
29No subcontracting costs.
30\item [Travel]
31The travel costs are associated to project meeting as
32well as participation to conferences. The travel costs are estimated
33to ??\% of the total requested ANR funding.
34\item [Expenses for inward billing]
35The costs justified by internal invoicing procedures are evaluated to 4\%
36of the total requested ANR funding.\\
37\end{description}
38
39
40\subsection{Partner 2: \lip}
41
[87]42%\ressourcehelp
43\begin{figure}\leavevmode\center
44\input{table_lip_full.tex}
45\caption{\label{ress-detail-lip}Man power in $mm$ for the delivrables of \lip.}
46\end{figure}
47\begin{description}
48\item [Equipment]
49No specific equipment acquisition.
50\item [Personnel costs]
51The faculty members involved in the project are a professor at ENS
52Lyon (Paul Feautrier) and a research associate (CR2) at INRIA
53Rh\^one-Alpes (Christophe Alias). The non-permanent personal required
54is a PhD student that will work on network process generation from
55polyhedral loops, then on extensions to non-polyhedral loops. We are
56looking for a student with both theoretical and practical skills, that
57will be able to get a sufficient understanding of the polyhedral
58techniques and to produce a working implementation.
[53]59
[87]60The table below summarizes the man power by task for both permanent and
61non-permanent personnels. The detail by delivrables is given in
62figure~\ref{ress-detail-lip}.
63The non-permanent personnels costs represent ??\% of the personnal
64costs. The requested funding for non permanent personnels is 100\% of
65the total ANR requested funding.
[99]66    \begin{center}\input{table_lip_short.tex}\end{center}
[87]67
68\item [Subcontracting]
69No subcontracting costs.
70\item [Travel]
71The travel costs are associated to project meeting as
72well as participation to conferences. The travel costs are estimated
73to ??\% of the total requested ANR funding.
74\item [Expenses for inward billing]
75The costs justified by internal invoicing procedures are evaluated to 4\%
76of the total requested ANR funding.\\
77\end{description}
78
79
[53]80%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[121]81\subsection{Partner 3: \tima}
[63]82\begin{figure}\leavevmode\center
83\input{table_tima_full.tex}
84\caption{\label{ress-detail-tima}Man power in $mm$ for the delivrables of \tima.}
85\end{figure}
86\begin{description}
[57]87\item [Equipment]
88No specific equipment acquisition.
89\item [Personnel costs]
90The permanent personnels involved in the project are professor and
[119]91assistant professors (Fr\'ed\'eric P\'etrot and Olivier Muller).
[57]92All non permanent personnel are Phd students.
93Related costs are estimated in men per months.
94One phd student (Adrien Prost-Boucle), funded by french ministry of research,
[119]95will be working on the project.
[57]96One 100\% funded phd student will be hired in september 2010. A second phd student
97will be hired in september 2011, but with half-funding on the project.
98The first PhD student will mainly work on the evolution of UGH HLS tool. Thus, we
[119]99are looking for a profile with strong informatic skills and good knowledge in
[57]100computer architecture.
101The second student will mainly work on dynamic reconfiguration and HPC. The required
102profil will be more oriented on computer architecture and advances digital design.
[53]103
[57]104The table below sumarizes the man power by task for both permanent and non-permanent
[63]105personnels. The detail by delivrables is given in figure~\ref{ress-detail-tima}.
[57]106The requested funding for personnels represent 47\% of the total personnal costs.
107The requested funding for non permanent personnels is 82\% of the total ANR
108requested funding.
[99]109\begin{center}\input{table_tima_short.tex}\end{center}
[57]110\item [Subcontracting]
111No subcontracting costs.
112\item [Travel]
113The travel costs are associated to project meeting as
114well as participation to conferences. The travel costs are estimated
115to 14\% of the total requested ANR funding.
116\item [Expenses for inward billing]
117The costs justified by internal invoicing procedures are evaluated to 4\%
118of the total requested ANR funding.\\
[63]119\end{description}
[57]120
[53]121%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[121]122\subsection{Partner 4: \ubs}
[99]123\begin{figure}\leavevmode\center
124\input{table_ubs_full.tex}
125\caption{\label{ress-detail-ubs}Man power in $mm$ for the delivrables of \ubs.}
126\end{figure}
[53]127
[70]128\begin {description}
129\item [Equipment]
130In order to validate the design flow project, the LabSTICC  laboratory will buy FPGA developpement boards.
131The cost for these FPGA boards is estimated to 3\% of the total ANR funding.
132\item [Personnel costs]
133The faculty members involved in the project are
[119]134associate professors (Philippe COUSSY, Cyrille CHAVET) or research engineers (Dominique HELLER).
[70]135All non-permanent personnel costs are estimated in men*months
136for senior researchers (post-doc or research engineers).
[99]137
[70]138The table below sumarizes the man power by task for both permanent and non-permanent
[99]139personnels. The detail by delivrables is given in figure~\ref {ress-detail-ubs}.
[70]140The non-permanent personnels costs represent 50\% of the personnal costs.
141The requested funding for non permanent personnels is about 83\% of the total ANR
142requested funding.
[99]143\begin{center}\input{table_ubs_short.tex}\end{center}
[70]144\item [Subcontracting]
145No subcontracting costs.
146\item [Travel]
147The travel costs are associated to management and meeting as
148well as participation to conferences. The travel costs are estimated
149to 10\% of the total requested ANR funding.
150\item [Expenses for inward billing]
151The costs justified by internal invoicing procedures are evaluated to 4\%
152of the total requested ANR funding.
153\end {description}
154
155
[53]156%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[121]157\subsection{Partner 5: \upmc}
[58]158\begin{figure}\leavevmode\center
159\input{table_upmc_full.tex}
160\caption{\label{ress-detail-upmc}Man power in $mm$ for the delivrables of \upmc.}
161\end{figure}
162\begin{description}
163\item[Equipment]
164    No specific equipment acquisition is required for this project.
165    The costs for depreciation of workstations
166    and pre-existing FPGA boards are evaluated to 7\% of the total
167    requested ANR funding.
168\item[Personnel costs]
169    The permanent personnels involved in the project are professors or
170    assistant processors (Alain Greiner and Ivan Aug\'e).
171    All non permanent personnel costs are estimated in men*months
172    for senior researchers (post-doc or research engineers).
173    The table below sumarizes the man power by task for both permanent  and non-permanent
174    personnels. The detail by delivrables is given in figure~\ref{ress-detail-upmc}.
175    The non-permanent personnels costs represent 50\% of the personnal costs.
176    The requested funding for non permanent personnels is 79\% of the total ANR
177    requested funding.
178    \begin{center}\input{table_upmc_short.tex}\end{center}
179\item[Subcontracting]
180    No subcontracting costs.
181\item[Travel]
182    The travel costs are associated to management and coordination meeting as
183    well as participation to conferences. The travel costs are estimated
184    to 10\% of the total requested ANR funding.
185\item[Expenses for inward billing]
186    The costs justified by internal invoicing procedures are evaluated to 4\%
187    of the total requested ANR funding.
188\end{description}
[53]189
190%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[121]191\subsection{Partner 6: \xilinx}
[114]192
[99]193\begin{figure}\leavevmode\center
194\input{table_xilinx_full.tex}
195\caption{\label{ress-detail-xilinx}Man power in $mm$ for the delivrables of \xilinx.}
196\end{figure}
197\begin{description}
198\item[Equipment]
199    No specific equipment acquisition is required for this project.
200\item[Personnel costs]
201    \xilinx employees involved in the project are permanent Software Engineers.
202    The detail by delivrables is given in figure~\ref{ress-detail-xilinx} and
[114]203    a sumary by task in the following table.
[99]204    \begin{center}\input{table_xilinx_short.tex}\end{center}
205\item[Subcontracting]
206    No subcontracting costs.
207\item[Travel]
208    The travel costs are associated to project meeting as well as participation to
209    conferences. The travel costs are estimated to
210    \mustbecompleted{FIXME:\xilinx: XX\%} of the total requested ANR funding.
211\item[Expenses for inward billing] none
212\item[Other working costs] none
213\end{description}
[53]214
215%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[121]216\subsection{Partner 7: \bull}
[53]217
[114]218\begin{description}
219\item[Equipment]
220    Acquisition of a FPGA development board will represent the main equipment cost for
221    Bull in COACH. It is estimated at about 5\% (tbc) of the total funding.
222\item[Personnel costs]
223    A permanent engineer will be assigned full time to the project for a duration of 20
224    months as shown in the table below:
225    \begin{center}\input{table_bull_short.tex}\end{center}
226\item[Subcontracting]
227    No subcontracting costs.
228\item[Travel]
229    Application of a standard 10\% of the total funding to travel costs.
230\item[Expenses for inward billing]
231    Costs justified by inward billing are estimated to about 5\% of the total funding.
232\item[Other working costs] none
233\end{description}
234
235
[53]236%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[121]237\subsection{Partner 8: \thales}
[53]238\ressourcehelp
239
240%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[121]241\subsection{Partner 9: \zied}
[53]242\ressourcehelp
243
244%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
[121]245\subsection{Partner 10: \navtel}
[53]246\ressourcehelp
247