| 7 | \input{table_inria_cairn_full.tex} |
---|
| 8 | \caption{\label{ress-detail-irisa}Man power in $mm$ for the delivrables of \irisa.} |
---|
| 9 | \end{figure} |
---|
| 10 | \begin{description} |
---|
| 11 | \item [Equipment] |
---|
| 12 | No specific equipment acquisition. |
---|
| 13 | \item [Personnel costs] The faculty members involved in the project |
---|
| 14 | are François Charot (INRIA researcher) Steven Derrien (associate |
---|
| 15 | professor) and Charles Wagner (research engineer). The non-permanent |
---|
| 16 | personal required is a PhD student that will mainly work on ASIP |
---|
[131] | 17 | generation. We are looking for a profile with strong informatic skills |
---|
[121] | 18 | and good knowledge in computer architecture. |
---|
[120] | 19 | |
---|
[131] | 20 | The table below summarizes the manpower by task for both permanent and |
---|
[121] | 21 | non-permanent personnels. The detail by delivrables is given in |
---|
| 22 | figure~\ref{ress-detail-irisa}. |
---|
| 23 | The non-permanent personnels costs represent ??\% of the personnal |
---|
| 24 | costs. The requested funding for non permanent personnels is 100\% of |
---|
| 25 | the total ANR requested funding. |
---|
| 26 | \begin{center}\input{table_inria_cairn_short.tex}\end{center} |
---|
[120] | 27 | |
---|
[121] | 28 | \item [Subcontracting] |
---|
| 29 | No subcontracting costs. |
---|
| 30 | \item [Travel] |
---|
| 31 | The travel costs are associated to project meeting as |
---|
| 32 | well as participation to conferences. The travel costs are estimated |
---|
| 33 | to ??\% of the total requested ANR funding. |
---|
| 34 | \item [Expenses for inward billing] |
---|
| 35 | The costs justified by internal invoicing procedures are evaluated to 4\% |
---|
| 36 | of the total requested ANR funding.\\ |
---|
| 37 | \end{description} |
---|
| 38 | |
---|
| 39 | |
---|
| 40 | \subsection{Partner 2: \lip} |
---|
| 41 | |
---|
[87] | 42 | \begin{figure}\leavevmode\center |
---|
| 43 | \input{table_lip_full.tex} |
---|
| 44 | \caption{\label{ress-detail-lip}Man power in $mm$ for the delivrables of \lip.} |
---|
| 45 | \end{figure} |
---|
[123] | 46 | |
---|
[87] | 47 | \begin{description} |
---|
| 48 | \item [Equipment] |
---|
| 49 | No specific equipment acquisition. |
---|
| 50 | \item [Personnel costs] |
---|
| 51 | The faculty members involved in the project are a professor at ENS |
---|
| 52 | Lyon (Paul Feautrier) and a research associate (CR2) at INRIA |
---|
| 53 | Rh\^one-Alpes (Christophe Alias). The non-permanent personal required |
---|
| 54 | is a PhD student that will work on network process generation from |
---|
| 55 | polyhedral loops, then on extensions to non-polyhedral loops. We are |
---|
| 56 | looking for a student with both theoretical and practical skills, that |
---|
| 57 | will be able to get a sufficient understanding of the polyhedral |
---|
| 58 | techniques and to produce a working implementation. |
---|
[53] | 59 | |
---|
[87] | 60 | The table below summarizes the man power by task for both permanent and |
---|
| 61 | non-permanent personnels. The detail by delivrables is given in |
---|
| 62 | figure~\ref{ress-detail-lip}. |
---|
| 63 | The non-permanent personnels costs represent ??\% of the personnal |
---|
| 64 | costs. The requested funding for non permanent personnels is 100\% of |
---|
| 65 | the total ANR requested funding. |
---|
[99] | 66 | \begin{center}\input{table_lip_short.tex}\end{center} |
---|
[87] | 67 | |
---|
| 68 | \item [Subcontracting] |
---|
| 69 | No subcontracting costs. |
---|
| 70 | \item [Travel] |
---|
| 71 | The travel costs are associated to project meeting as |
---|
| 72 | well as participation to conferences. The travel costs are estimated |
---|
| 73 | to ??\% of the total requested ANR funding. |
---|
| 74 | \item [Expenses for inward billing] |
---|
| 75 | The costs justified by internal invoicing procedures are evaluated to 4\% |
---|
| 76 | of the total requested ANR funding.\\ |
---|
| 77 | \end{description} |
---|
| 78 | |
---|
| 79 | |
---|
[53] | 80 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 81 | \subsection{Partner 3: \tima} |
---|
[63] | 82 | \begin{figure}\leavevmode\center |
---|
| 83 | \input{table_tima_full.tex} |
---|
| 84 | \caption{\label{ress-detail-tima}Man power in $mm$ for the delivrables of \tima.} |
---|
| 85 | \end{figure} |
---|
| 86 | \begin{description} |
---|
[57] | 87 | \item [Equipment] |
---|
| 88 | No specific equipment acquisition. |
---|
| 89 | \item [Personnel costs] |
---|
| 90 | The permanent personnels involved in the project are professor and |
---|
[131] | 91 | assistant professor (Fr\'ed\'eric P\'etrot and Olivier Muller). |
---|
[130] | 92 | The non permanent personnels are Phd students and post-doc researchers. |
---|
[57] | 93 | Related costs are estimated in men per months. |
---|
[131] | 94 | One phd student (Adrien Prost-Boucle), funded by the |
---|
| 95 | french ministry of research, |
---|
[119] | 96 | will be working on the project. |
---|
[130] | 97 | One 100\% funded phd student will be hired in september 2010. A post-doc researcher |
---|
[131] | 98 | will be hired at the end of 2011 for one year and an half. |
---|
[130] | 99 | The PhD student will mainly work on the evolution of UGH HLS tool. Thus, we |
---|
[119] | 100 | are looking for a profile with strong informatic skills and good knowledge in |
---|
[57] | 101 | computer architecture. |
---|
[130] | 102 | The post-doc will mainly work on dynamic reconfiguration and HPC. The required |
---|
[131] | 103 | profile will be more oriented on computer architecture and advanced digital design. |
---|
[53] | 104 | |
---|
[57] | 105 | The table below sumarizes the man power by task for both permanent and non-permanent |
---|
[63] | 106 | personnels. The detail by delivrables is given in figure~\ref{ress-detail-tima}. |
---|
[130] | 107 | The requested funding for personnels represent 50\% of the total personnal costs. |
---|
| 108 | The requested funding for non permanent personnels is 85\% of the total ANR |
---|
[57] | 109 | requested funding. |
---|
[99] | 110 | \begin{center}\input{table_tima_short.tex}\end{center} |
---|
[57] | 111 | \item [Subcontracting] |
---|
| 112 | No subcontracting costs. |
---|
| 113 | \item [Travel] |
---|
| 114 | The travel costs are associated to project meeting as |
---|
| 115 | well as participation to conferences. The travel costs are estimated |
---|
[130] | 116 | to 11\% of the total requested ANR funding. |
---|
[57] | 117 | \item [Expenses for inward billing] |
---|
| 118 | The costs justified by internal invoicing procedures are evaluated to 4\% |
---|
| 119 | of the total requested ANR funding.\\ |
---|
[63] | 120 | \end{description} |
---|
[57] | 121 | |
---|
[53] | 122 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 123 | \subsection{Partner 4: \ubs} |
---|
[99] | 124 | \begin{figure}\leavevmode\center |
---|
| 125 | \input{table_ubs_full.tex} |
---|
| 126 | \caption{\label{ress-detail-ubs}Man power in $mm$ for the delivrables of \ubs.} |
---|
| 127 | \end{figure} |
---|
[53] | 128 | |
---|
[70] | 129 | \begin {description} |
---|
| 130 | \item [Equipment] |
---|
| 131 | In order to validate the design flow project, the LabSTICC laboratory will buy FPGA developpement boards. |
---|
| 132 | The cost for these FPGA boards is estimated to 3\% of the total ANR funding. |
---|
| 133 | \item [Personnel costs] |
---|
| 134 | The faculty members involved in the project are |
---|
[119] | 135 | associate professors (Philippe COUSSY, Cyrille CHAVET) or research engineers (Dominique HELLER). |
---|
[70] | 136 | All non-permanent personnel costs are estimated in men*months |
---|
| 137 | for senior researchers (post-doc or research engineers). |
---|
[99] | 138 | |
---|
[70] | 139 | The table below sumarizes the man power by task for both permanent and non-permanent |
---|
[99] | 140 | personnels. The detail by delivrables is given in figure~\ref {ress-detail-ubs}. |
---|
[70] | 141 | The non-permanent personnels costs represent 50\% of the personnal costs. |
---|
| 142 | The requested funding for non permanent personnels is about 83\% of the total ANR |
---|
| 143 | requested funding. |
---|
[99] | 144 | \begin{center}\input{table_ubs_short.tex}\end{center} |
---|
[70] | 145 | \item [Subcontracting] |
---|
| 146 | No subcontracting costs. |
---|
| 147 | \item [Travel] |
---|
| 148 | The travel costs are associated to management and meeting as |
---|
| 149 | well as participation to conferences. The travel costs are estimated |
---|
| 150 | to 10\% of the total requested ANR funding. |
---|
| 151 | \item [Expenses for inward billing] |
---|
| 152 | The costs justified by internal invoicing procedures are evaluated to 4\% |
---|
| 153 | of the total requested ANR funding. |
---|
| 154 | \end {description} |
---|
| 155 | |
---|
| 156 | |
---|
[53] | 157 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 158 | \subsection{Partner 5: \upmc} |
---|
[58] | 159 | \begin{figure}\leavevmode\center |
---|
| 160 | \input{table_upmc_full.tex} |
---|
| 161 | \caption{\label{ress-detail-upmc}Man power in $mm$ for the delivrables of \upmc.} |
---|
| 162 | \end{figure} |
---|
| 163 | \begin{description} |
---|
| 164 | \item[Equipment] |
---|
| 165 | No specific equipment acquisition is required for this project. |
---|
| 166 | The costs for depreciation of workstations |
---|
| 167 | and pre-existing FPGA boards are evaluated to 7\% of the total |
---|
| 168 | requested ANR funding. |
---|
| 169 | \item[Personnel costs] |
---|
| 170 | The permanent personnels involved in the project are professors or |
---|
| 171 | assistant processors (Alain Greiner and Ivan Aug\'e). |
---|
| 172 | All non permanent personnel costs are estimated in men*months |
---|
| 173 | for senior researchers (post-doc or research engineers). |
---|
| 174 | The table below sumarizes the man power by task for both permanent and non-permanent |
---|
| 175 | personnels. The detail by delivrables is given in figure~\ref{ress-detail-upmc}. |
---|
| 176 | The non-permanent personnels costs represent 50\% of the personnal costs. |
---|
| 177 | The requested funding for non permanent personnels is 79\% of the total ANR |
---|
| 178 | requested funding. |
---|
| 179 | \begin{center}\input{table_upmc_short.tex}\end{center} |
---|
| 180 | \item[Subcontracting] |
---|
| 181 | No subcontracting costs. |
---|
| 182 | \item[Travel] |
---|
| 183 | The travel costs are associated to management and coordination meeting as |
---|
| 184 | well as participation to conferences. The travel costs are estimated |
---|
| 185 | to 10\% of the total requested ANR funding. |
---|
| 186 | \item[Expenses for inward billing] |
---|
| 187 | The costs justified by internal invoicing procedures are evaluated to 4\% |
---|
| 188 | of the total requested ANR funding. |
---|
| 189 | \end{description} |
---|
[53] | 190 | |
---|
| 191 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 192 | \subsection{Partner 6: \xilinx} |
---|
[114] | 193 | |
---|
[99] | 194 | \begin{figure}\leavevmode\center |
---|
| 195 | \input{table_xilinx_full.tex} |
---|
| 196 | \caption{\label{ress-detail-xilinx}Man power in $mm$ for the delivrables of \xilinx.} |
---|
| 197 | \end{figure} |
---|
| 198 | \begin{description} |
---|
| 199 | \item[Equipment] |
---|
| 200 | No specific equipment acquisition is required for this project. |
---|
| 201 | \item[Personnel costs] |
---|
| 202 | \xilinx employees involved in the project are permanent Software Engineers. |
---|
| 203 | The detail by delivrables is given in figure~\ref{ress-detail-xilinx} and |
---|
[114] | 204 | a sumary by task in the following table. |
---|
[99] | 205 | \begin{center}\input{table_xilinx_short.tex}\end{center} |
---|
| 206 | \item[Subcontracting] |
---|
| 207 | No subcontracting costs. |
---|
| 208 | \item[Travel] |
---|
| 209 | The travel costs are associated to project meeting as well as participation to |
---|
| 210 | conferences. The travel costs are estimated to |
---|
[143] | 211 | 2\% of the total requested ANR funding. |
---|
[99] | 212 | \item[Expenses for inward billing] none |
---|
| 213 | \item[Other working costs] none |
---|
| 214 | \end{description} |
---|
[53] | 215 | |
---|
| 216 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 217 | \subsection{Partner 7: \bull} |
---|
[53] | 218 | |
---|
[114] | 219 | \begin{description} |
---|
| 220 | \item[Equipment] |
---|
| 221 | Acquisition of a FPGA development board will represent the main equipment cost for |
---|
| 222 | Bull in COACH. It is estimated at about 5\% (tbc) of the total funding. |
---|
| 223 | \item[Personnel costs] |
---|
| 224 | A permanent engineer will be assigned full time to the project for a duration of 20 |
---|
| 225 | months as shown in the table below: |
---|
[126] | 226 | \begin{center}\input{table_bull_full.tex}\end{center} |
---|
[114] | 227 | \item[Subcontracting] |
---|
| 228 | No subcontracting costs. |
---|
| 229 | \item[Travel] |
---|
| 230 | Application of a standard 10\% of the total funding to travel costs. |
---|
| 231 | \item[Expenses for inward billing] |
---|
| 232 | Costs justified by inward billing are estimated to about 5\% of the total funding. |
---|
| 233 | \item[Other working costs] none |
---|
| 234 | \end{description} |
---|
| 235 | |
---|
| 236 | |
---|
[53] | 237 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 238 | \subsection{Partner 8: \thales} |
---|
[53] | 239 | |
---|
[123] | 240 | \begin{description} |
---|
| 241 | \item[Equipment] |
---|
| 242 | In order to validate the design flow,TRT will buy FPGA developpement boards. The cost |
---|
[125] | 243 | for these FPGA boards is estimated to 20 k\euro (6\% of the total ANR funding). |
---|
[123] | 244 | \item[Personnel costs] |
---|
[131] | 245 | The effort to adapt SPEAR DE to generate the input files to COACH framework is |
---|
[126] | 246 | estimated to 13 man.months. |
---|
| 247 | The effort to describe and develop the application is estimated to 14 man.month. |
---|
[131] | 248 | Finally we need one man.month for the partiticipation to the global specification in task 2. |
---|
[123] | 249 | \begin{center}\input{table_thales_full.tex}\end{center} |
---|
| 250 | \item[Subcontracting] |
---|
| 251 | No subcontracting costs. |
---|
| 252 | \item[Travel] |
---|
| 253 | The travel costs are associated to meeting, plenaries as well as participation to |
---|
[125] | 254 | conferences. The travel costs are estimated to 10 k\euro. The travel costs are estimated to |
---|
[123] | 255 | 5\% of the total requested ANR funding. |
---|
| 256 | \item[Expenses for inward billing] none |
---|
| 257 | \item[Other working costs] none |
---|
| 258 | \end{description} |
---|
| 259 | |
---|
[53] | 260 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 261 | \subsection{Partner 9: \zied} |
---|
[53] | 262 | |
---|
[123] | 263 | \begin{center}\input{table_zied_full.tex}\end{center} |
---|
| 264 | |
---|
[53] | 265 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 266 | \subsection{Partner 10: \navtel} |
---|
[53] | 267 | |
---|
[125] | 268 | \begin{description} |
---|
| 269 | \item[Equipment] |
---|
| 270 | Navtel will use FPGA board with ARM processors for the validation. |
---|
[131] | 271 | The costs for depreciation of the board and the instrument of test |
---|
[125] | 272 | are evaluated to 7\% of the total requested ANR funding. |
---|
| 273 | \item[Personnel costs] |
---|
[131] | 274 | A permanent engineer will be assigned on average 1/3 time for |
---|
| 275 | all the duration of the project. |
---|
| 276 | The table below shows the estimated manpower cost in months for the delivrables. |
---|
[125] | 277 | \begin{center}\input{table_navtel_full.tex}\end{center} |
---|
| 278 | \item[Subcontracting] |
---|
| 279 | No subcontracting costs. |
---|
| 280 | \item[Travel] |
---|
| 281 | The travel costs are associated to meeting, plenaries as well as participation to |
---|
| 282 | conferences. The travel costs are estimated to 3 k\euro. |
---|
| 283 | \item[Expenses for inward billing] none |
---|
| 284 | \item[Other working costs] none |
---|
| 285 | \end{description} |
---|