    9090The permanent personnels involved in the project are professor and
    9191assistant professors (Fr\'ed\'eric P\'etrot and Olivier Muller).
    92 All non permanent personnel are Phd students.
     92The non permanent personnels are Phd students and post-doc researchers.
    9393Related costs are estimated in men per months.
    9494One phd student (Adrien Prost-Boucle), funded by french ministry of research,
    9595will be working on the project.
    96 One 100\% funded phd student will be hired in september 2010. A second phd student
    97 will be hired in september 2011, but with half-funding on the project.
    98 The first PhD student will mainly work on the evolution of UGH HLS tool. Thus, we
     96One 100\% funded phd student will be hired in september 2010. A post-doc researcher
     97will be hired in end of 2011 for one year and an half.
     98The PhD student will mainly work on the evolution of UGH HLS tool. Thus, we
    9999are looking for a profile with strong informatic skills and good knowledge in
    100100computer architecture.
    101 The second student will mainly work on dynamic reconfiguration and HPC. The required
     101The post-doc will mainly work on dynamic reconfiguration and HPC. The required
    102102profil will be more oriented on computer architecture and advances digital design.
    103103
    104104The table below sumarizes the man power by task for both permanent and non-permanent
    105105personnels. The detail by delivrables is given in figure~\ref{ress-detail-tima}.
    106 The requested funding for personnels represent 47\% of the total personnal costs.
    107 The requested funding for non permanent personnels is 82\% of the total ANR
     106The requested funding for personnels represent 50\% of the total personnal costs.
     107The requested funding for non permanent personnels is 85\% of the total ANR
    108108requested funding.
    109109\begin{center}\input{table_tima_short.tex}\end{center}
     
    113113The travel costs are associated to project meeting as
    114114well as participation to conferences. The travel costs are estimated
    115 to 14\% of the total requested ANR funding.
     115to 11\% of the total requested ANR funding.
    116116\item [Expenses for inward billing]
    117117The costs justified by internal invoicing procedures are evaluated to 4\%