Changeset 131 for anr/section-7.tex
- Timestamp:
- Feb 11, 2010, 12:35:51 PM (15 years ago)
- File:
-
- 1 edited
Legend:
- Unmodified
- Added
- Removed
-
anr/section-7.tex
r130 r131 15 15 professor) and Charles Wagner (research engineer). The non-permanent 16 16 personal required is a PhD student that will mainly work on ASIP 17 generation. We are looking for profile with strong informatic skills17 generation. We are looking for a profile with strong informatic skills 18 18 and good knowledge in computer architecture. 19 19 20 The table below summarizes the man 20 The table below summarizes the manpower by task for both permanent and 21 21 non-permanent personnels. The detail by delivrables is given in 22 22 figure~\ref{ress-detail-irisa}. … … 89 89 \item [Personnel costs] 90 90 The permanent personnels involved in the project are professor and 91 assistant professor s(Fr\'ed\'eric P\'etrot and Olivier Muller).91 assistant professor (Fr\'ed\'eric P\'etrot and Olivier Muller). 92 92 The non permanent personnels are Phd students and post-doc researchers. 93 93 Related costs are estimated in men per months. 94 One phd student (Adrien Prost-Boucle), funded by french ministry of research, 94 One phd student (Adrien Prost-Boucle), funded by the 95 french ministry of research, 95 96 will be working on the project. 96 97 One 100\% funded phd student will be hired in september 2010. A post-doc researcher 97 will be hired inend of 2011 for one year and an half.98 will be hired at the end of 2011 for one year and an half. 98 99 The PhD student will mainly work on the evolution of UGH HLS tool. Thus, we 99 100 are looking for a profile with strong informatic skills and good knowledge in 100 101 computer architecture. 101 102 The post-doc will mainly work on dynamic reconfiguration and HPC. The required 102 profil will be more oriented on computer architecture and advancesdigital design.103 profile will be more oriented on computer architecture and advanced digital design. 103 104 104 105 The table below sumarizes the man power by task for both permanent and non-permanent … … 242 243 for these FPGA boards is estimated to 20 k\euro (6\% of the total ANR funding). 243 244 \item[Personnel costs] 244 The effort to adapt SPEAR DE to generat orthe input files to COACH framework is245 The effort to adapt SPEAR DE to generate the input files to COACH framework is 245 246 estimated to 13 man.months. 246 247 The effort to describe and develop the application is estimated to 14 man.month. 247 Finally we need 1man.month for the partiticipation to the global specification in task 2.248 Finally we need one man.month for the partiticipation to the global specification in task 2. 248 249 \begin{center}\input{table_thales_full.tex}\end{center} 249 250 \item[Subcontracting] … … 268 269 \item[Equipment] 269 270 Navtel will use FPGA board with ARM processors for the validation. 270 The costs for depreciation of the board and the instrument of t he test271 The costs for depreciation of the board and the instrument of test 271 272 are evaluated to 7\% of the total requested ANR funding. 272 273 \item[Personnel costs] 273 A permanent engineer will be assigned on average 1/3 time to274 theall the duration of the project.275 The table below shows the estimated man 274 A permanent engineer will be assigned on average 1/3 time for 275 all the duration of the project. 276 The table below shows the estimated manpower cost in months for the delivrables. 276 277 \begin{center}\input{table_navtel_full.tex}\end{center} 277 278 \item[Subcontracting]
Note: See TracChangeset
for help on using the changeset viewer.