[159] | 8 | No specific equipment acquisition. |
---|
[121] | 9 | \item [Personnel costs] The faculty members involved in the project |
---|
| 10 | are François Charot (INRIA researcher) Steven Derrien (associate |
---|
| 11 | professor) and Charles Wagner (research engineer). The non-permanent |
---|
| 12 | personal required is a PhD student that will mainly work on ASIP |
---|
[131] | 13 | generation. We are looking for a profile with strong informatic skills |
---|
[121] | 14 | and good knowledge in computer architecture. |
---|
[159] | 15 | \parlf |
---|
[164] | 16 | The table below summarizes the manpower in \hommemois by tasks for both permanent and |
---|
[159] | 17 | non-permanent personnels. The detail by deliverables is given in |
---|
| 18 | figure~\ref{table-livrables-1}. |
---|
| 19 | The non-permanent personnels costs represent \mustbecompleted{??\%} of the personnal |
---|
| 20 | costs. The requested funding for non permanent personnels is 100\% of |
---|
| 21 | the total ANR requested funding. |
---|
[121] | 22 | \begin{center}\input{table_inria_cairn_short.tex}\end{center} |
---|
| 23 | \item [Subcontracting] |
---|
[159] | 24 | No subcontracting costs. |
---|
[121] | 25 | \item [Travel] |
---|
[159] | 26 | The travel costs are associated to project meeting as well as participation to |
---|
| 27 | conferences. The travel costs are estimated to \mustbecompleted{??\%} of the total |
---|
| 28 | requested ANR funding. |
---|
[121] | 29 | \item [Expenses for inward billing] |
---|
[159] | 30 | The costs justified by internal invoicing procedures are evaluated to 4\% of the total |
---|
| 31 | requested ANR funding. |
---|
[121] | 32 | \end{description} |
---|
| 33 | |
---|
| 34 | |
---|
| 35 | \subsection{Partner 2: \lip} |
---|
[192] | 36 | |
---|
[87] | 37 | \begin{description} |
---|
| 38 | \item [Equipment] |
---|
[167] | 39 | No specific equipment acquisition. The costs for depreciation of |
---|
| 40 | workstations is evaluated to 4\% of the total requested ANR funding. |
---|
[87] | 41 | \item [Personnel costs] |
---|
[167] | 42 | The faculty members involved in the project are an emeritus |
---|
| 43 | professor at ENS Lyon (Paul Feautrier) and a research associate |
---|
| 44 | (CR2) at INRIA Rh\^one-Alpes (Christophe Alias). The non-permanent |
---|
[174] | 45 | personel required is a PhD student that will work on network process |
---|
[167] | 46 | generation from polyhedral loops, then on extensions to |
---|
| 47 | non-polyhedral loops. We are looking for a student with both |
---|
| 48 | theoretical and practical skills, that will be able to get a |
---|
| 49 | sufficient understanding of the polyhedral techniques and to produce |
---|
| 50 | a working implementation. |
---|
[159] | 51 | \parlf |
---|
[174] | 52 | The table below summarizes the \hommemois by |
---|
[167] | 53 | deliverables and tasks for both permanent and non-permanent |
---|
| 54 | personnels. The non-permanent personnels costs represent 23\% of |
---|
| 55 | the personnal costs. The requested funding for non |
---|
| 56 | permanent personnels is 100\% of the total ANR requested funding. |
---|
[192] | 57 | \begin{center}\input{table_inria_compsys_full.tex}\end{center} |
---|
[87] | 58 | \item [Subcontracting] |
---|
[159] | 59 | No subcontracting costs. |
---|
[87] | 60 | \item [Travel] |
---|
[167] | 61 | The travel costs are associated to project meeting as well as |
---|
| 62 | participation to conferences. The travel costs are estimated to 20\% |
---|
| 63 | of the total requested ANR funding. |
---|
[87] | 64 | \item [Expenses for inward billing] |
---|
[167] | 65 | The costs justified by internal invoicing procedures are evaluated |
---|
| 66 | to 4\% of the total requested ANR funding. |
---|
[87] | 67 | \end{description} |
---|
| 68 | |
---|
[53] | 69 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 70 | \subsection{Partner 3: \tima} |
---|
[161] | 71 | |
---|
[63] | 72 | \begin{description} |
---|
[57] | 73 | \item [Equipment] |
---|
[161] | 74 | No specific equipment acquisition. |
---|
[57] | 75 | \item [Personnel costs] |
---|
[161] | 76 | The permanent personnels involved in the project are professor and assistant professor |
---|
| 77 | (Fr\'ed\'eric P\'etrot and Olivier Muller). |
---|
| 78 | The non permanent personnels are Phd students and post-doc researchers. |
---|
[164] | 79 | Related costs are estimated in \hommemois. |
---|
[161] | 80 | One phd student (Adrien Prost-Boucle), funded by the french ministry of research, will |
---|
| 81 | be working on the project. |
---|
| 82 | One 100\% funded phd student will be hired in september 2010. A post-doc researcher will |
---|
| 83 | be hired at the end of 2011 for one year and an half. |
---|
| 84 | The PhD student will mainly work on the evolution of UGH HLS tool. Thus, we are looking |
---|
| 85 | for a profile with strong informatic skills and good knowledge in computer architecture. |
---|
| 86 | The post-doc will mainly work on dynamic reconfiguration and HPC. The required profile |
---|
| 87 | will be more oriented on computer architecture and advanced digital design. |
---|
| 88 | \parlf |
---|
[162] | 89 | The table below sumarizes the man power in \hommemois by tasks for both permanent and |
---|
[161] | 90 | non-permanent personnels. The detail by deliverables is given in |
---|
| 91 | figure~\ref{table-livrables-1}. |
---|
| 92 | The requested funding for personnels represent 50\% of the total personnal costs. |
---|
| 93 | The requested funding for non permanent personnels is 85\% of the total ANR requested |
---|
| 94 | funding. |
---|
| 95 | \begin{center}\input{table_tima_short.tex}\end{center} |
---|
[57] | 96 | \item [Subcontracting] |
---|
[161] | 97 | No subcontracting costs. |
---|
[57] | 98 | \item [Travel] |
---|
[161] | 99 | The travel costs are associated to project meeting as well as participation to |
---|
| 100 | conferences. The travel costs are estimated to 11\% of the total requested ANR funding. |
---|
[57] | 101 | \item [Expenses for inward billing] |
---|
[161] | 102 | The costs justified by internal invoicing procedures are evaluated to 4\% of the total |
---|
| 103 | requested ANR funding. |
---|
[63] | 104 | \end{description} |
---|
[57] | 105 | |
---|
[53] | 106 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 107 | \subsection{Partner 4: \ubs} |
---|
[53] | 108 | |
---|
[70] | 109 | \begin {description} |
---|
| 110 | \item [Equipment] |
---|
[197] | 111 | In order to validate the design flow project, the Lab-STICC laboratory will buy FPGA |
---|
[161] | 112 | developpement boards. The cost for these FPGA boards is estimated to 3\% of the total |
---|
| 113 | ANR funding. |
---|
[70] | 114 | \item [Personnel costs] |
---|
[161] | 115 | The faculty members involved in the project are associate professors (Philippe COUSSY, |
---|
| 116 | Cyrille CHAVET) or research engineers (Dominique HELLER). All non-permanent personnel |
---|
[164] | 117 | costs are estimated in \hommemois for senior researchers (post-doc or research |
---|
[161] | 118 | engineers). |
---|
| 119 | \parlf |
---|
[162] | 120 | The table below sumarizes the man power in \hommemois by tasks for both permanent and |
---|
[161] | 121 | non-permanent personnels. The detail by deliverables is given in |
---|
| 122 | figure~\ref{table-livrables-2}. |
---|
| 123 | The non-permanent personnels costs represent 50\% of the personnal costs. |
---|
| 124 | The requested funding for non permanent personnels is about 83\% of the total ANR |
---|
| 125 | requested funding. |
---|
| 126 | \begin{center}\input{table_ubs_short.tex}\end{center} |
---|
[70] | 127 | \item [Subcontracting] |
---|
[161] | 128 | No subcontracting costs. |
---|
[70] | 129 | \item [Travel] |
---|
[161] | 130 | The travel costs are associated to management and meeting as well as participation to |
---|
| 131 | conferences. The travel costs are estimated to 10\% of the total requested ANR funding. |
---|
[70] | 132 | \item [Expenses for inward billing] |
---|
[161] | 133 | The costs justified by internal invoicing procedures are evaluated to 4\% of the total |
---|
| 134 | requested ANR funding. |
---|
[70] | 135 | \end {description} |
---|
| 136 | |
---|
| 137 | |
---|
[53] | 138 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 139 | \subsection{Partner 5: \upmc} |
---|
[162] | 140 | |
---|
[58] | 141 | \begin{description} |
---|
| 142 | \item[Equipment] |
---|
| 143 | No specific equipment acquisition is required for this project. |
---|
[162] | 144 | The costs for depreciation of workstations and pre-existing FPGA boards are evaluated |
---|
| 145 | to 7\% of the total requested ANR funding. |
---|
[58] | 146 | \item[Personnel costs] |
---|
[162] | 147 | The permanent personnels involved in the project are professors or assistant |
---|
| 148 | processors (Alain Greiner and Ivan Aug\'e). |
---|
| 149 | All non permanent personnel costs are estimated in \hommemois for senior researchers |
---|
| 150 | (post-doc or research engineers). |
---|
| 151 | The table below sumarizes the man power by tasks in \hommemois for both permanent and |
---|
| 152 | non-permanent personnels. |
---|
| 153 | The detail by deliverables is given in figure~\ref{table-livrables-2}. |
---|
[58] | 154 | The non-permanent personnels costs represent 50\% of the personnal costs. |
---|
| 155 | The requested funding for non permanent personnels is 79\% of the total ANR |
---|
| 156 | requested funding. |
---|
| 157 | \begin{center}\input{table_upmc_short.tex}\end{center} |
---|
| 158 | \item[Subcontracting] |
---|
| 159 | No subcontracting costs. |
---|
| 160 | \item[Travel] |
---|
| 161 | The travel costs are associated to management and coordination meeting as |
---|
| 162 | well as participation to conferences. The travel costs are estimated |
---|
| 163 | to 10\% of the total requested ANR funding. |
---|
| 164 | \item[Expenses for inward billing] |
---|
| 165 | The costs justified by internal invoicing procedures are evaluated to 4\% |
---|
| 166 | of the total requested ANR funding. |
---|
| 167 | \end{description} |
---|
[53] | 168 | |
---|
| 169 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 170 | \subsection{Partner 6: \xilinx} |
---|
[114] | 171 | |
---|
[99] | 172 | \begin{description} |
---|
| 173 | \item[Equipment] |
---|
[162] | 174 | No specific equipment acquisition is required for this project. |
---|
[99] | 175 | \item[Personnel costs] |
---|
[162] | 176 | \xilinx employees involved in the project are permanent Software Engineers. |
---|
| 177 | The man power detail in \hommemois by deliverables is given in |
---|
| 178 | figure~\ref{table-livrables-1} and a sumary by task in the following table. |
---|
| 179 | \begin{center}\input{table_xilinx_short.tex}\end{center} |
---|
[99] | 180 | \item[Subcontracting] |
---|
[162] | 181 | No subcontracting costs. |
---|
[99] | 182 | \item[Travel] |
---|
[162] | 183 | The travel costs are associated to project meeting as well as participation to |
---|
| 184 | conferences. The travel costs are estimated to 2\% of the total requested ANR funding. |
---|
[99] | 185 | \item[Expenses for inward billing] none |
---|
| 186 | \item[Other working costs] none |
---|
| 187 | \end{description} |
---|
[53] | 188 | |
---|
| 189 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 190 | \subsection{Partner 7: \bull} |
---|
[53] | 191 | |
---|
[114] | 192 | \begin{description} |
---|
| 193 | \item[Equipment] |
---|
| 194 | Acquisition of a FPGA development board will represent the main equipment cost for |
---|
| 195 | Bull in COACH. It is estimated at about 5\% (tbc) of the total funding. |
---|
| 196 | \item[Personnel costs] |
---|
| 197 | A permanent engineer will be assigned full time to the project for a duration of 20 |
---|
[164] | 198 | months as shown in the table below that gives the man power in \hommemois: |
---|
[126] | 199 | \begin{center}\input{table_bull_full.tex}\end{center} |
---|
[114] | 200 | \item[Subcontracting] |
---|
| 201 | No subcontracting costs. |
---|
| 202 | \item[Travel] |
---|
| 203 | Application of a standard 10\% of the total funding to travel costs. |
---|
| 204 | \item[Expenses for inward billing] |
---|
| 205 | Costs justified by inward billing are estimated to about 5\% of the total funding. |
---|
| 206 | \item[Other working costs] none |
---|
| 207 | \end{description} |
---|
| 208 | |
---|
| 209 | |
---|
[53] | 210 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 211 | \subsection{Partner 8: \thales} |
---|
[53] | 212 | |
---|
[123] | 213 | \begin{description} |
---|
| 214 | \item[Equipment] |
---|
| 215 | In order to validate the design flow,TRT will buy FPGA developpement boards. The cost |
---|
[125] | 216 | for these FPGA boards is estimated to 20 k\euro (6\% of the total ANR funding). |
---|
[123] | 217 | \item[Personnel costs] |
---|
[131] | 218 | The effort to adapt SPEAR DE to generate the input files to COACH framework is |
---|
[164] | 219 | estimated to 13 \hommemois. |
---|
| 220 | The effort to describe and develop the application is estimated to 14 \hommemois. |
---|
| 221 | Finally we need one \hommemois for the partiticipation to the global specification in task 2. |
---|
| 222 | This is sumarized in the table below: |
---|
[123] | 223 | \begin{center}\input{table_thales_full.tex}\end{center} |
---|
| 224 | \item[Subcontracting] |
---|
| 225 | No subcontracting costs. |
---|
| 226 | \item[Travel] |
---|
| 227 | The travel costs are associated to meeting, plenaries as well as participation to |
---|
[125] | 228 | conferences. The travel costs are estimated to 10 k\euro. The travel costs are estimated to |
---|
[123] | 229 | 5\% of the total requested ANR funding. |
---|
| 230 | \item[Expenses for inward billing] none |
---|
| 231 | \item[Other working costs] none |
---|
| 232 | \end{description} |
---|
| 233 | |
---|
[53] | 234 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 235 | \subsection{Partner 9: \zied} |
---|
[53] | 236 | |
---|
[192] | 237 | \begin{description} |
---|
| 238 | \item[Equipment] |
---|
| 239 | No equipement costs. |
---|
| 240 | \item[Personnel costs] |
---|
| 241 | The effort to define SoC architecture and adapt eFPGA interface to generate is |
---|
| 242 | estimated to 9.6 \hommemois. |
---|
| 243 | The effort to develop demonstrator and to extract eFPGA timining characteristics is |
---|
| 244 | estimated to 4.8 \hommemois. |
---|
| 245 | Finally we need one 3.6 man.month for the evaluation of the FLEXRAS solution. |
---|
| 246 | The table below summarizes the these manpower costs in \hommemois for the deliverables |
---|
| 247 | and by tasks. |
---|
| 248 | \begin{center}\input{table_zied_full.tex}\end{center} |
---|
| 249 | \item[Subcontracting] |
---|
| 250 | No subcontracting costs. |
---|
| 251 | \item[Travel] |
---|
| 252 | No travel costs. |
---|
| 253 | \item[Expenses for inward billing] none |
---|
| 254 | \item[Other working costs] none |
---|
| 255 | \end{description} |
---|
[123] | 256 | |
---|
[53] | 257 | %%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%% |
---|
[121] | 258 | \subsection{Partner 10: \navtel} |
---|
[53] | 259 | |
---|
[125] | 260 | \begin{description} |
---|
| 261 | \item[Equipment] |
---|
| 262 | Navtel will use FPGA board with ARM processors for the validation. |
---|
[131] | 263 | The costs for depreciation of the board and the instrument of test |
---|
[125] | 264 | are evaluated to 7\% of the total requested ANR funding. |
---|
| 265 | \item[Personnel costs] |
---|
[131] | 266 | A permanent engineer will be assigned on average 1/3 time for |
---|
| 267 | all the duration of the project. |
---|
[192] | 268 | The table below shows the estimated manpower cost in \hommemois for the deliverables |
---|
| 269 | and by tasks. |
---|
[125] | 270 | \begin{center}\input{table_navtel_full.tex}\end{center} |
---|
| 271 | \item[Subcontracting] |
---|
| 272 | No subcontracting costs. |
---|
| 273 | \item[Travel] |
---|
| 274 | The travel costs are associated to meeting, plenaries as well as participation to |
---|
| 275 | conferences. The travel costs are estimated to 3 k\euro. |
---|
| 276 | \item[Expenses for inward billing] none |
---|
| 277 | \item[Other working costs] none |
---|
| 278 | \end{description} |
---|
[159] | 279 | % |
---|
| 280 | \begin{landscape} |
---|
| 281 | \begin{figure} |
---|
| 282 | \begin{small} |
---|
| 283 | \settowidth\desclen{XILINX RTL optimisation (5)} |
---|
| 284 | \def\resstablestyletitle#1{\parbox{\desclen}{\textit{#1}}} |
---|
| 285 | \begin{minipage}[b]{.47\linewidth}\center |
---|
| 286 | \input{table_inria_cairn_full.tex}\vspace{.5ex}\\ \irisa \vspace{2.5ex}\\ |
---|
| 287 | \input{table_xilinx_full.tex}\vspace{.5ex}\\ \xilinx\\ |
---|
| 288 | \end{minipage}\hfill\begin{minipage}[b]{.47\linewidth}\center |
---|
| 289 | \input{table_tima_full.tex}\vspace{.5ex} \\ \tima |
---|
| 290 | \end{minipage} |
---|
| 291 | \end{small} |
---|
[162] | 292 | \caption{\label{table-livrables-1} Man power in \hommemois for the deliverables (1)} |
---|
[159] | 293 | \end{figure} |
---|
| 294 | % |
---|
| 295 | \begin{figure} |
---|
| 296 | \begin{small} |
---|
| 297 | \settowidth\desclen{XILINX RTL optimisation (5)} |
---|
| 298 | \def\resstablestyletitle#1{\parbox{\desclen}{\textit{#1}}} |
---|
| 299 | \begin{minipage}[b]{.47\linewidth}\center |
---|
| 300 | \input{table_ubs_full.tex}\vspace{.5ex}\\ \ubs \vspace{2.5ex}\\ |
---|
[164] | 301 | %\input{table_thales_full.tex}\vspace{.5ex}\\ \thales \\ |
---|
[159] | 302 | \end{minipage}\hfill\begin{minipage}[b]{.47\linewidth}\center |
---|
| 303 | \input{table_upmc_full.tex}\vspace{.5ex} \\ \upmc |
---|
| 304 | \end{minipage} |
---|
| 305 | \end{small} |
---|
[162] | 306 | \caption{\label{table-livrables-2} Man power in \hommemois for the deliverables (2)} |
---|
[159] | 307 | \end{figure} |
---|
| 308 | \end{landscape} |
---|