Ignore:
Timestamp:
Feb 10, 2011, 7:23:52 PM (14 years ago)
Author:
coach
Message:
 
File:
1 edited

Legend:

Unmodified
Added
Removed
  • anr/section-ressources.tex

    r363 r364  
    5656            \ifx\cont\tmp\def\cont{None.}\else\def\cont{%
    5757              The costs justified by internal invoicing procedures are evaluated
    58               to #5\% of the total requested ANR funding.}\fi
     58              to \textbf{#5\%} of the total requested ANR funding.}\fi
    5959              \cont
    6060        %\item[Other working costs] None
     
    8181%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
    8282
    83 The global effort is 358 \hommemois (\hommemoislong),
     83The global effort is \mustbecompleted{XXXXXXXX 358} \hommemois (\hommemoislong),
    8484the part of academic partners is 236 \hommemois (66\% of the global effort)
    8585and the part of the industrial partners is 122 \hommemois (\textbf{34\%} of the
     
    100100  annexe~\ref{table-livrables-mds} (page \pageref{table-livrables-mds}).
    101101  and a summary by task in the following table.
    102    \mustbecompleted{\\MDS: Vous n'etes dans aucuns projets annexe 7.3 ?}
    103102  }
    104103  {2}
    105104  {}
    106 
    107 % \begin{description}
    108 % \item[Equipment]
    109 %   No specific equipment acquisition is required for this project.
    110 % \item[Personnel costs]
    111 %   \mds employees involved in the project are permanent managers, engineers and PhD graduates.
    112 %   The man power detail in \hommemois by deliverables is given in
    113 %   annexe~\ref{table-livrables-mds} (page \pageref{table-livrables-mds}).
    114 %   and a sumary by task in the following table.
    115 %   \begin{center}\input{table_mds_short.tex}\end{center}
    116 % \item[Subcontracting]
    117 %   No subcontracting costs.
    118 % \item[Travel]
    119 %   The travel costs are associated to project meeting as well as participation to
    120 %   conferences. The travel costs are estimated to 2\% of the total requested ANR funding.
    121 % \item[Expenses for inward billing] none
    122 % \item[Other working costs] none
    123 % \end{description}
    124105
    125106%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
     
    133114   }}
    134115  {8}{3.5}
    135 %
    136 % \begin{description}
    137 % \item[Equipment]
    138 %     In order to validate the COACH design flow, \upmc will buy FPGA development
    139 %     boards (especially 1  PCI/E FPGA \xilinx board).
    140 %     The cost for these boards is estimated to 6 k\euro (4\% of the total ANR funding).
    141 % \item[Personnel costs]
    142 %     The permanent personnels involved in the project are professors or assistant
    143 %     professors (Alain Greiner and Ivan Aug\'e).
    144 %     All non permanent personnel costs are estimated in \hommemois for senior researchers
    145 %     (post-doc or research engineers).
    146 %     The table below sumarizes the man power by tasks in \hommemois for both permanent  and
    147 %     non-permanent personnels.
    148 %     The detail by deliverables is given in annexe~\ref{table-livrables-upmc} (page \pageref{table-livrables-upmc}).
    149 %     The non-permanent personnels costs (24 \hommemois) represent 46\% of the personnal costs.
    150 %     The requested funding for non permanent personnels is 79\% of the total ANR
    151 %     requested funding.
    152 %     \begin{center}\input{table_upmc_short.tex}\end{center}
    153 % \item[Subcontracting]
    154 %     No subcontracting costs.
    155 % \item[Travel]
    156 %     The travel costs are associated to management and coordination meeting as
    157 %     well as participation to conferences. The travel costs are estimated
    158 %     to 10\% of the total requested ANR funding.
    159 % \item[Expenses for inward billing]
    160 %     The costs justified by internal invoicing procedures are evaluated to 4\%
    161 %     of the total requested ANR funding.
    162 % \end{description}
    163116
    164117%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
     
    168121  {ubs}
    169122  {}
    170   {{\ubs}{48}{24}{Philippe COUSSY, Cyrille CHAVET and Dominique HELLER}{84}{
     123  {{\ubs}{48}{24}{Philippe COUSSY, Cyrille CHAVET and Dominique HELLER}{85}{
    171124   We are looking for profiles with strong informatic skills, good knowledge
    172125   in computer architecture and advanced digital design.
    173    \mustbecompleted{\\UBS:  ./gantt < anr.gant\\
    174    \t WARNING: ubs       :D511 probleme sur l'an 1 (in table=7.0, in gantt=6.0 \\
    175    \t ERROR:   ubs       :D840 probleme sur l'an 1 (in table=0.5, in gantt=0.0}
    176126  }}
    177   {11}{4}
    178 
    179 % \begin {description}
    180 % \item [Equipment]
    181 %   In order to validate the design flow project, the Lab-STICC laboratory will buy FPGA
    182 %   development boards.  The cost for these FPGA boards is estimated to 3\% of the total
    183 %   ANR funding.
    184 % \item [Personnel costs]
    185 %   The faculty members involved in the project are associate professors (Philippe COUSSY,
    186 %   Cyrille CHAVET) or research engineers (Dominique HELLER). All non-permanent personnel
    187 %   costs are estimated in \hommemois for senior researchers (post-doc or research
    188 %   engineers).
    189 %   \parlf
    190 %   The table below summarizes the man power in \hommemois by tasks for both permanent and
    191 %   non-permanent personnels. The detail by deliverables is given in
    192 %   annexe~\ref{table-livrables-usb} (page \pageref{table-livrables-usb}).
    193 %   The non-permanent personnels costs represent 50\% of the personnel costs.
    194 %   The requested funding for non permanent personnels is about 83\% of the total ANR
    195 %   requested funding.
    196 %     \begin{center}\input{table_ubs_short.tex}\end{center}
    197 % \item [Subcontracting]
    198 %   No subcontracting costs.
    199 % \item [Travel]
    200 %   The travel costs are associated to management and meeting as well as participation to
    201 %   conferences. The travel costs are estimated to 10\% of the total requested ANR funding.
    202 % \item [Expenses for inward billing]
    203 %   The costs justified by internal invoicing procedures are evaluated to 4\% of the total
    204 %   requested ANR funding.
    205 % \end {description}
     127  {12}{4}
     128
    206129
    207130%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
     
    209132\ressourcesForAcademic
    210133 {inria_compsys}{}
    211  {{\lip}{46}{21}{Christophe Alias and Paul Feautrier}{\mustbecompleted{100}}{
     134 {{\lip}{46}{21}{Christophe Alias and Paul Feautrier}{82}{
    212135   \\We are looking for a candidate with both theoretical and
    213136   practical skills, that will be able to get a sufficient
     
    219142   }}
    220143 {12}{4}
    221 %
    222 % \begin{description}
    223 % \item [Equipment]
    224 %   No specific equipment acquisition. The costs for depreciation of
    225 %   workstations is evaluated to 4\% of the total requested ANR funding.
    226 % \item [Personnel costs] The faculty members involved in the project
    227 %   are Christophe Alias (INRIA researcher) and Paul Feautrier (emeritus
    228 %   professor at ENS-Lyon). The non-permanent personel required is a
    229 %   post-doc that will work on FIFO construction, then on extensions of
    230 %   process construction and memory optimization to non-polyhedral
    231 %   loops.  We are looking for a candidate with both theoretical and
    232 %   practical skills, that will be able to get a sufficient
    233 %   understanding of the polyhedral techniques to produce a working
    234 %   implementation.
    235 %   \parlf
    236 %   The table below summarizes the \hommemois by tasks for both permanent
    237 %   and non-permanent personnels.
    238 %   Annexe~\ref{table-livrables-lip} (page \pageref{table-livrables-lip})
    239 %   details this table at the deliverable level.
    240 %   The effort of permanent personnels represents 61\% of
    241 %   the total effort. The non-permanent personnels costs represents
    242 %   52\% of the personal costs. The requested funding for non permanent
    243 %   personnels is 100\% of the total ANR requested
    244 %   funding.
    245 %   \begin{center}\input{table_inria_compsys_short.tex}\end{center}
    246 % \item [Subcontracting]
    247 %   No subcontracting costs.
    248 % \item [Travel]
    249 %   The travel costs are associated to project meeting as well as
    250 %   participation to conferences. The travel costs are estimated to 20\%
    251 %   of the total requested ANR funding.
    252 % \item [Expenses for inward billing]
    253 %   The costs justified by internal invoicing procedures are evaluated
    254 %   to 4\% of the total requested ANR funding.
    255 % \end{description}
    256144
    257145%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
     
    264152    }}
    265153 {10}{4}
    266 %
    267 % \begin{description}
    268 % \item [Equipment]
    269 %   No specific equipment acquisition.
    270 % \item [Personnel costs]
    271 %   The permanent personnels involved in the project are professor and associate professor
    272 %   (Fr\'ed\'eric P\'etrot and Olivier Muller).
    273 %   The non permanent personnels are Phd students and post-doc researchers.
    274 %   Related costs are estimated in \hommemois.
    275 %   One phd student (Adrien Prost-Boucle), funded by the French ministry of research, will
    276 %   be working on the project.
    277 %   One 100\% funded phd student will be hired in September 2011.
    278 %   A post-doc researcher will be hired at the end of 2012 for one year.
    279 %   The PhD student will mainly work on the evolution of UGH HLS tool. Thus, we are looking
    280 %   for a profile with strong informatic skills and good knowledge in computer architecture.
    281 %   The post-doc will mainly work on HPC. The required profile
    282 %   will be more oriented on computer architecture and advanced digital design.
    283 %   \parlf
    284 %   The table below summarizes the man power in \hommemois by tasks for both permanent and
    285 %   non-permanent personnels. The detail by deliverables is given in
    286 %   annexe~\ref{table-livrables-tima} (page \pageref{table-livrables-tima}).
    287 %   The effort of permanent personnels represents 50\% of the total effort.
    288 %   The requested funding for non permanent personnels is 86\% of the total ANR requested
    289 %   funding.
    290 %     \begin{center}\input{table_tima_short.tex}\end{center}
    291 % \item [Subcontracting]
    292 %   No subcontracting costs.
    293 % \item [Travel]
    294 %   The travel costs are associated to project meeting as well as participation to
    295 %   conferences. The travel costs are estimated to 10\% of the total requested ANR funding.
    296 % \item [Expenses for inward billing]
    297 %   The costs justified by internal invoicing procedures are evaluated to 4\% of the total
    298 %   requested ANR funding.
    299 % \end{description}
    300154
    301155%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
     
    308162   }}
    309163 {10}{4}
    310 %
    311 % \begin{description}
    312 % \item [Equipment]
    313 %   No specific equipment acquisition.
    314 % \item [Personnel costs] The faculty members involved in the project
    315 %   are François Charot (INRIA researcher) and Steven Derrien (associate
    316 %   professor).
    317 %   The non-permanent personal required is a PhD
    318 %   student that will mainly work on ASIP generation. We are looking for
    319 %   a profile with strong informatic skills and good knowledge in
    320 %   computer architecture.
    321 %   \parlf
    322 %   The table below summarizes the manpower in \hommemois by tasks for both permanent and
    323 %   non-permanent personnels. The detail by deliverables is given in
    324 %   annexe~\ref{table-livrables-inria} (page \pageref{table-livrables-inria}).
    325 %   The non-permanent personnels costs represent {48\%} of the personnal
    326 %   costs. The requested funding for non permanent personnels is 100\% of
    327 %   the total ANR requested funding.
    328 %     \begin{center}\input{table_inria_cairn_short.tex}\end{center}
    329 % \item [Subcontracting]
    330 %   No subcontracting costs.
    331 % \item [Travel]
    332 %   The travel costs are associated to project meeting as well as participation to
    333 %   conferences. The travel costs are estimated to {7,5\%} of the total
    334 %   requested ANR funding.
    335 % \item [Expenses for inward billing]
    336 %   The costs justified by internal invoicing procedures are evaluated to 4\% of the total
    337 %   requested ANR funding.
    338 % \end{description}
    339164
    340165%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
     
    353178    and an engineer  for 27 \hommemois.}
    354179  {10}{5}
    355 
    356 % \begin{description}
    357 % \item[Equipment]
    358 %     Acquisition of a FPGA development board will represent the main equipment cost for
    359 %     Bull in COACH. It is estimated at about 5\% (tbc) of the total funding.
    360 % \item[Personnel costs]
    361 %     A permanent engineer will be assigned full time to the project for a duration of 36
    362 %     months as shown in the table below that summarizes the man power in \hommemois.
    363 %     The detail  by deliverables is given in
    364 %     annexe~\ref{table-livrables-bull} (page \pageref{table-livrables-bull}).
    365 %     \begin{center}\input{table_bull_short.tex}\end{center}
    366 % \item[Subcontracting]
    367 %     No subcontracting costs.
    368 % \item[Travel]
    369 %     Application of a standard 10\% of the total funding to travel costs.
    370 % \item[Expenses for inward billing]
    371 %     Costs justified by inward billing are estimated to about 5\% of the total funding.
    372 % \item[Other working costs] none
    373 % \end{description}
    374 
    375180
    376181%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
Note: See TracChangeset for help on using the changeset viewer.