    101101  and a summary by task in the following table.
    102102  }
    103   {2}
     103  {3.5}
    104104  {}
    105105
     
    167167\ressources
    168168  {bull}
    169   { The design of FPGA board (s) will represent the main equipment cost for Bull
    170     in COACH. It is estimated at about 10 k\euro (about 12\% of the total
    171     requested ANR funding) representing the re-design/adaptation of an
    172     existing FPGA board (the SAM "Simulation Accelerated Module" board).}
     169  {}
    173170  {
    174171    The man power detail in \hommemois by deliverables is given in
     
    177174    \bull employees involved in the project are a manager for 9 \hommemois
    178175    and an engineer  for 27 \hommemois.}
    179   {10}{5}
     176  {10}{}
     177
     178% {The design of FPGA board (s) will represent the main equipment cost for Bull
     179%  in COACH. It is estimated at about 10 k\euro (about 12\% of the total
     180%  requested ANR funding) representing the re-design/adaptation of an
     181%  existing FPGA board (the SAM "Simulation Accelerated Module" board).}